HORIZON
Share

UNIVERSAL PALACE

BRERAP92324-1/963/R-673/2019 · RERA Bihar · https://gethorizon.in/projects/universal-palace-patna-sadar-qb716reg

01

Complete project overview

RERA Bihar · Registration filing
Project name
UNIVERSAL PALACE
Units
22 units
Unit mix
12 × 2 BHK · 10 × 3 BHK
Parking
22 spaces
Land area
1,378 sq m
Built-up area
2,187 sq m

Timeline

Project startedApr 2019
RERA registeredJun 2019
Proposed completionApr 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

22 units across 2 batches
BuildingTypeArea sq mCount
UNIVERSAL PALACE2 BHK012
UNIVERSAL PALACE3 BHK010

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

BRAJENDRA KUMAR BUILDERS PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2019–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
Patna
Anchal (block)
Patna Sadar
Mauja (revenue village)
Kumharara
Address
Mauza- Kumhrar, Thana- Sultanganj, Patna.
What’s nearby
SchoolsNearest school 1.3km away · Library 1.3km away
HealthcareHospital 320m away · 1 clinic within 1km
LifestylePark 669m away · Gym or sports centre 673m away
ShoppingSupermarket 1.8km away · Mall 1.1km away
Getting around
Expressway 601 m · Chapra - Patna HighwayPrimary road 1.0 kmRailway line 875 m · Howrah - Delhi RailwayMetro station 852m away (Zero Mile)Limited bus connectivity nearby
Water & environment
Water body 462 mCanal 828 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹3.55 Cr declared to build 22 flats. What that works out to:

₹16.14 Lakhdeclared cost per flatall-in — land + construction
₹1,508/sq ftof built-up area₹16,229/sq m
63%of the cost is land₹1,517/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹21,488per sq yd
₹25,699per sq m
Which rate
residential land, by road position
Matched to
The rate published for “Kumhrar”.
Highest rate
₹26,591 per sq yd — the top road-facing rate among the residential rates published for this locality

By the road it faces

Res. Branch Road₹25,699 / sq m₹21,488 / sq yd
Res. Main Road₹31,802 / sq m₹26,591 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this locality.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (26 Apr 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

358 residential projects still under way within 25 km. Step out ring by ring:

2 projects within 1 km — showing the nearest 2.

MAURYA VIHAR COLONYResidential/Group Housing

J B ENCLAVE

KUMAR BUILDCON PVT LTD

Jun 2025registered
Aug 2028target completion
Declared cost₹12.55 CrScale34 flatsAuthorityRERA Bihar
JAKARIYAPURMixed Development(residential and commercial)

BASUDEO TOWER

AWADH DEVELOPERS

Sep 2025registered
Mar 2029target completion
Declared cost₹18.29 CrScale32 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.