HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Varad Vihar

P52700024573 · MahaRERA · https://gethorizon.in/projects/varad-vihar-godoli-ct-satara-8m6jgi2j

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Varad Vihar
Units
20 units
Mix
12 × 2 BHK · 8 × 1 BHK
Carpet area
46–64 sq mper-unit range, as filed
Floors
6
Parking
5 spaces
Land area
965 sq m
Sanctioned built-up
1,157 sq m

Timeline

RERA registeredFeb 2020
Proposed completionApr 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

20 units across 9 batches
TypeArea sq mCount
2 BHK632
2 BHK622
2 BHK642
2 BHK632
2 BHK622
2 BHK642
1 BHK462
1 BHK464
1 BHK462

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

varadvinayak Developers

PartnershipPromoter type
Satara, MAHARASHTRABased in
3Projects
3Cities
2020–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
335 homeson the public record across 3 projects
5,589 sq mbuilt-up filed
7,910 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from varadvinayak Developers— the full portfolio →

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 17.6807, 74.0043 · © OpenStreetMap contributors
Village
Godoli (CT)
Taluka
Satara
District
Satara
Pincode
415001
Survey no.
survey no 154/D/3/4/1/1 plot no 15/1A
North boundary
adjusent plot number 14
East boundary
plot no 15-2
South boundary
Road and plot number 15 - 1B
West boundary
survey no 155
What’s nearby
SchoolsNearest school 1.9km away · College or university 853m away
HealthcareHospital 611m away · 2 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.9 kmPrimary road 528 mNo metro or railway within 5kmBus stop within 1km
Water & environment
Water body 831 mCanal 2.3 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

145 residential projects still under way within 25 km. Step out ring by ring:

17 projects within 1 km — showing the nearest 6.

SataraResidential / Group Housing

Nirmala

Kamlesh Madhukar Pisal HUF

Jun 2022registered
Apr 2027target completion
Scale10 flatsAuthorityMahaRERA
SadarbazarResidential / Group Housing

Sanjog Niketan

Shree Niketan Developers

Oct 2025registered
May 2028target completion
Government Guidance Rate₹34,173/sq ydScale12 flatsAuthorityMahaRERA
GodoliResidential / Group Housing

ARYA HEIGHTS

ARYA PROPERTIES

Mar 2022registered
Mar 2027target completion
Scale60 flatsAuthorityMahaRERA
GodoliResidential / Group Housing

UNITY CROWN

UNITY BUILDCON GROUP

Mar 2024registered
Dec 2028target completion
Scale29 flatsAuthorityMahaRERA
SataraResidential / Group Housing

Vedant Residency

ATHARV BUILDERS AND DEVELOPERS

Oct 2020registered
Sep 2026target completion
Scale29 flatsAuthorityMahaRERA
SadarbazarResidential / Group Housing

CITY AVENUE

VISAWA BUILDWELL

Apr 2023registered
Mar 2027target completion
Government Guidance Rate₹34,173/sq ydScale33 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/varad-vihar-godoli-ct-satara-8m6jgi2j.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.