HORIZON
Share

VARDHMAN EMPIRE

RAJ/P/2017/400 · RAJ-RERA · https://gethorizon.in/projects/vardhman-empire-sanganer-jaipur-4vstpnlp

01

Complete project overview

RAJ-RERA · Registration filing
Project name
VARDHMAN EMPIRE
Units
40 units
Mix
8 × 1BHK · 8 × 2BHK(Type 1) · 8 × 2BHK (Type 2) · 8 × 2BHK (Type 3) · 7 × 3BHK · 1 × 2BHK (Type 4)
Carpet area
58–504 sq mper-type range, as filed
Land area
1,063 sq m
Completion deadline extended
1 extension on record — latest to 30 Dec 2019

Timeline

Construction startFeb 2013
RERA registeredOct 2017
Proposed completionDec 2018
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

40 units across 6 batches
BuildingTypeArea sq mCount
VARDHMAN EMPIRE1BHK3748
VARDHMAN EMPIRE3BHK5017
VARDHMAN EMPIRE2BHK(Type 1)5048
VARDHMAN EMPIRE2BHK (Type 2)3898
VARDHMAN EMPIRE2BHK (Type 3)3978
VARDHMAN EMPIRE2BHK (Type 4)581

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RAJ-RERA · Builder registration

SHREENATH COLONIZER DELOPERS PRIVATE LIMITED

OrganisationPromoter type
Jaipur, RajasthanBased in
1Projects
1City
2017–2018Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
Address
121,122,155,156, SANGANER, GANPATPURA, Sanganer, Jaipur, 302019
Village
GANPATPURA
Taluka
Sanganer
District
Jaipur
Pincode
302019
What’s nearby
SchoolsNearest school 1.4km away
HealthcareHospital 444m away · 5 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · Swimming pool within 2km
ShoppingNo supermarket within 2km · Mall 1.2km away
Getting around
Expressway 1.2 km · Ajmer RoadPrimary road 896 mRailway line 2.8 km · Jaipur to Sawai Madhopur LineMetro station 729m away (Vivek Vihar)Bus stop within 1km
Water & environment
Water body 469 m · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹6.80 Cr declared to build 40 flats. What that works out to:

₹17.01 Lakhdeclared cost per flatall-in — land + construction
₹1,876/sq ftof built-up area₹20,195/sq m
12%of the cost is land₹701/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Rajasthan registration department

In Rajasthan it’s called the DLC rate.

No government guidance rate is shown for this project.

Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

RAJ-RERA · Approved building plan

Jaipur Development Authority

Development Authority
Building Permitapproved 31 Oct 2017 · 8 yrs ago

The promised possession date (31 Dec 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Jaipur Development Authority

Development authority

Has approved 644 RERA projectsabout 1 in 3 in Rajasthan, more than any other body in the state.

a mixed market52% apartments · 48% plotted layouts.

Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017

More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RAJ-RERA

07

Other projects nearby

The register · within 25 km

421 residential projects still under way within 25 km. Step out ring by ring:

3 projects within 1 km — showing the nearest 3.

SanganerGroup Housing

RUHEEN SHIVAM

JAI MATA DI BUILDERS

Apr 2026registered
Mar 2029target completion
Declared cost₹37.72 CrScale72 flatsAuthorityRAJ-RERA
JaipurGroup Housing

Parth Crystal

CRYSTAL HEIGHTS

May 2025registered
Dec 2026target completion
Declared cost₹17.21 CrScale39 flatsAuthorityRAJ-RERA
JaipurGroup Housing

ENVISION HEIGHTS

ENVISION HEIGHTS

Apr 2025registered
Jan 2027target completion
Declared cost₹12.50 CrScale24 flatsAuthorityRAJ-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.