Road · Drinking water · Water supply · Sewage & drainage · Electricity · Fire fighting · Emergency evacuation · Solid waste · Rain-water harvesting · Renewable energy · EV charging
Timeline
Building permit grantedFeb 2022
Proposed completionFeb 2027
TodaySep 2026
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
UnitCarpet sq m
111First98
112First104
113First72
114First72
115First104
116First98
121Second98
122Second104
123Second72
124Second72
125Second104
126Second98
131Third98
132Third104
133Third72
134Third72
135Third104
136Third98
141Fourth98
142Fourth104
143Fourth72
144Fourth72
145Fourth104
146Fourth98
151Fifth98
152Fifth104
153Fifth72
154Fifth72
155Fifth104
156Fifth98
161Sixth98
162Sixth104
163Sixth72
164Sixth72
165Sixth104
166Sixth98
171Seventh98
172Seventh104
173Seventh72
174Seventh72
175Seventh104
176Seventh98
181Eighth98
182Eighth104
183Eighth72
184Eighth72
185Eighth104
186Eighth98
191Ninth98
192Ninth104
193Ninth72
194Ninth72
195Ninth104
196Ninth98
211First98
212First104
213First72
214First72
215First104
216First98
221Second98
222Second104
223Second72
224Second72
225Second104
226Second98
231Third98
232Third104
233Third72
234Third72
235Third104
236Third98
241Fourth98
242Fourth104
243Fourth72
244Fourth72
245Fourth104
246Fourth98
251Fifth98
252Fifth104
253Fifth72
254Fifth72
255Fifth104
256Fifth98
261Sixth98
262Sixth104
263Sixth72
264Sixth72
265Sixth104
266Sixth98
271Seventh98
272Seventh104
273Seventh72
274Seventh72
275Seventh104
276Seventh98
281Eighth98
282Eighth104
283Eighth72
284Eighth72
285Eighth104
286Eighth98
291Ninth98
292Ninth104
293Ninth72
294Ninth72
295Ninth104
296Ninth98
SHOP A1Ground20
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
All 109 units as filed, two to a row · areas in sq m
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.1 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 1.2 kmWater body 1.8 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~40 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Jan 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate could not be cross-checked against nearby filings.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Jharkhand registration department
In Jharkhand it’s called the MVR (minimum value register) rate.
No government guidance rate is shown for this project.
Jharkhand's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
JHARERA · Approved building plan
Building Permitapproved 17 Feb 2022 · 4 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
07
Complaints & litigation
JHARERA · public record
Complaints register
Not published. JHARERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to JHARERA
Litigation
None declared in this filing
Only what the builder declared, or what JHARERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with JHARERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
96 residential projects still under way within 25 km. Step out ring by ring:
Of the 57 projects the radar draws within 6 km — every kind, every stage — 29 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Jharkhand's published schedules.
06Planning authority
JHARERA: the approved building plan, as filed.
07Complaints & litigation
JHARERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/vijaya-heights-golmuri-cum-jugsalai-ukbzjd4p.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.