HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
74 units
Mix
50 × 3BHK · 24 × 2BHK
Booked
9 of 74 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
3,328 sq m
Floor area
15,379 sq m
Description
WESTFORT INEOS

Timeline

Project startedFeb 2024
RERA registeredJun 2024
Proposed completionFeb 2029
TodayJul 2026
Construction progress

6% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Fire Fighting Fittings and Equipment1%
Excavation2%
Staircases, Lifts Wells2%
Overhead and Underground Water Tanks.2%
Installation of lifts, water pumps etc3%
Sanitary Fittings4%
Completion of terraces floor each building4%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc4%
The external plumbing and external plastering6%
Stilt Floor7%
Electrical Fittings7%
Basement(s) and Plinth9%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings13%
Slabs of Super Structure36%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

65 of 74 available
TypeArea sq mAvailable
3BHK13412 of 12
3BHK13413 of 13
2BHK958 of 12
3BHK13413 of 13
2BHK928 of 12
3BHK13411 of 12

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

WESTFORT REALTORS PRIVATE LIMITED

CompanyPromoter type
Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Companypadi
Village
IRINGAPRAM
Taluk
Chavakkad
District
Thrissur
Pincode
680103
Survey no.
35/8 , 137/6
What’s nearby
SchoolsNearest school 1.1km away · College or university 201m away · Library 1.4km away
HealthcareHospital 1.4km away
LifestylePark 1.0km away · Gym or sports centre 1.4km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 914m away · Mall 215m away · Convenience store within 1km
Getting around
Expressway 3.6 kmPrimary road 152 m · Chavakkad - Wadakkanchery RoadRailway line 467 m · Guruvayur-ThrissurRailway station 1.3km away (Guruvayur)2 bus stops within 500m
Water & environment
Water body 251 mCanal 327 m · guruvayoor valiya thodu
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Guruvayur Municipality

Municipality
approved 21 Feb 2024 · 2 yrs ago
Building Permit no. BA-289/2019/20Survey no. 35/8 , 137/6
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA-289/2019/20 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Guruvayur Municipality

Municipal corporation / municipality

Has approved 11 RERA projects0.7% of Kerala.

an apartments market82% apartments · 18% plotted layouts. Apartments like yours are this body's core business.

Builders
8
On record
408 flats · 44 plots
Since
2021

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.