The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kothrud
Taluka
Haveli
District
Pune
Pincode
411038
Survey no.
CTS NO 221
North boundary
SOBASHILP SOCIETY
East boundary
15 M WIDE MAIN ROAD
South boundary
NHAVIWADA AND KUMBHARWADA SUNDARSHILP SOCIETY
West boundary
9 M WIDE KOTHRUD GAOTHAN ROAD
What’s nearby
Schools1 school within 500m · 7 educational institutions within 1km · College or university 1.4km away
HealthcareHospital 193m away · 5 clinics within 1km · Pharmacy within 500m
LifestylePark 1.5km away · Gym or sports centre 1.4km away · 27+ restaurants and cafes within 1km
ShoppingSupermarket 918m away · Convenience store within 1km · Bank 26m away
Getting around
Expressway 1.6 km · Katraj - Dehu Road BypassPrimary road 4 m · Paud RoadMetro station 260m away (Vanaz)8 bus stops within 500m
Water & environment
Water body 738 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹90,135per sq yd
₹1,07,800per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Kothrud”.
In force
2026-2027 schedule
Spread
₹68,663 – ₹1,29,299 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Building Permit
Survey no. CTS NO 221
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
The planning authority
The body that approved this project. It has approved 4,607 RERA projects across 33 districts — about 1 in 4 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,245 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
85 projects within 1 km — showing the nearest 6.
PuneResidential / Group Housing
Vighnahar
Panchtatva Realty LLP
2 yr 6 mo
Jul 2024registered
Jan 2027target completion
Government Guidance Rate₹58,077/sq ydScale22 flatsAuthorityMahaRERA