This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Latur (M Cl)
Taluka
Latur
District
Latur
Pincode
413531
Survey no.
14
North boundary
PLOT NO 13
East boundary
PLOT NO 7
South boundary
PLOT NO 15
West boundary
ROAD
What’s nearby
Schools1 school within 1km · 7 educational institutions within 1km · College or university 426m away
HealthcareHospital 350m away · Clinic within 2km
LifestylePark 596m away · Gym or sports centre 818m away · 8 restaurants and cafes within 1km
Expressway 130 m · Nanded Ring RoadPrimary road 1.3 km · New Barshi RoadRailway line 5.0 kmNo metro or railway within 5kmBus stop within 1km
Water & environment
Water body 1.9 km · Kava Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹25,820per sq yd
₹30,880per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Latur (M Cl)”.
In force
2026-2027 schedule
Spread
₹18,763 – ₹52,425 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Latur Municipal Corporation
Municipal Corporation
Building Permit
Survey no. 14
The promised possession date (30 Oct 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Latur Municipal Corporation
Municipal corporation
Has approved 32 RERA projects — 0.2% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
29
On record
204 flats · 0 plots
Since
2019
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
46 residential projects still under way within 25 km. Step out ring by ring:
3 projects within 1 km — showing the nearest 3.
LaturResidential / Group Housing
RUDRAKSH DHAM
HIREMATH DEVELOPERS
4 yr 8 mo
Jul 2026registered
Mar 2031target completion
Government Guidance Rate₹25,820/sq ydScale30 flatsAuthorityMahaRERA