Yes — registered under affordable housingprice caps & eligibility apply
Timeline
Project startedMar 2021
RERA registeredJun 2021
Proposed completionJun 2024
TodaySep 2026
Construction progress
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
80 units across 1 batch
TypeArea sq mCount
Residential Flats6980
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Othersthis project1 of 2 projects
Rajkot Municipal CorporationMunicipal / Corporation1 of 2 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.6km away · College or university 942m away
HealthcareHospital 665m away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 935m away · Swimming pool within 2km
ShoppingSupermarket 1.1km away
Getting around
Expressway 2.0 km · 150 Foot Ring Road FlyoverPrimary road 872 m · AG Chowk FlyoverRailway line 3.5 km · Rajkot–SomnathRailway station 4.1km away (Bhaktinagar)Limited bus connectivity nearby
Water & environment
River 626 mWater body 1.2 km · Water Tank
distances only — not a flood assessment
Land, title & encumbrance
LoansProject loan(s) declared, no units under mortgage
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹15.98 Cr declared to build 80 flats. What that works out to:
₹15.00 Lakh – ₹33.21 Lakhdeclared unit pricerange on the filing — not a live asking price
₹19.98 Lakhdeclared cost per flatall-in — land + construction
₹2,673/sq ftof carpet area₹28,769/sq m
28%of the cost is land₹1,588/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground on the plot until 2022; a building is first visible in 2023 and is about 20 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.
Satellite photographs of the same ground
Feb 2017Mar 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2023.
Plot outline was drawn by the promoter on the RERA portal and can be misplaced - check it against the image.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Gujarat registration department
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
GujRERA · Approved building plan
Others
Building Permitapproved 1 Jun 2021 · 5 yrs ago
The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 11 Jan 2024)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
The approving authority
The body that approved this project. It has approved 2,653 RERA projects across 26 talukas — about 1 in 6 in Gujarat.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
07
Complaints & litigation
GujRERA · public record
Complaints on GujRERA's register
GujRERA's own register
1 complaint
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Number
Date
GJ/CMP/SM/Rajkot/230602/0090
2 Jun 2023
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
411 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,343 projects the radar draws within 6 km — every kind, every stage — 265 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Gujarat's published schedules.
06Planning authority
GujRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
Complaints on GujRERA's register.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/99-merrygold-rajkot-eovwc53h.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.