Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
289 units across 20 batches
TypeArea sq mCount
1 BHK387
2 BHK4923
2 BHK4492
4 BHK872
2 BHK4430
4 BHK871
3 BHK881
1 BHK3020
2 BHK602
1 BHK3212
1 BHK3022
2 BHK591
1 BHK282
2 BHK406
2 BHK3714
2 BHK3710
4 BHK744
3 BHK558
3 BHK4916
3 BHK4916
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
1,536 homes · 321 plotson the public record across 17 projects
1,29,565 sq mbuilt-up filed
59,075 sq mplotted area
1,07,992 sq mland declared
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Being portion of approved layout of Gat no. 195, 222, 223 and 224 of Village Gahunje, Taluka Maval
North boundary
Balance portion of Gat nos 195 222 223 and 224
East boundary
Balance portion of Gat Nos 195 222 223 and 224
South boundary
Balance portion of Gat nos 195 222 223 and 224
West boundary
Balance portion of Gat Nos 195 222 223 and 224
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.6km away · Clinic within 2km
LifestylePark 824m away · 3 restaurants and cafes within 1km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.7 km · Katraj - Dehu Road BypassPrimary road 1.7 kmRailway line 2.9 kmRailway station 2.9km away (Dehu Road)Limited bus connectivity nearby
Water & environment
Water body 663 mRiver 970 m · Pavana
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~50 m of the recorded location until 2022; a building is first visible in 2023 and is about 12 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~50 m of the filed location.
Satellite photographs of the same ground
Feb 2017Feb 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2023.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~50 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate sits 3-10 km from other projects with the same pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Pune Metropolitan Region Development Authority
Metropolitan Development Authority
Building Permit
Survey no. Being portion of approved layout of Gat no. 195, 222, 223 and 224 of Village Gahunje, Taluka Maval
The promised possession date (30 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pune Metropolitan Region Development Authority
Metropolitan / development authority
Has approved 1,013 RERA projects — about 1 in 20 in Maharashtra.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
Builders
604
On record
21,940 flats · 10,299 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12504560
21 Dec 2025
Roznama Approvedopen
CC12500404
6 Feb 2025
Order Approveddisposed
CC12400383
10 Oct 2024
Order Approveddisposed
CC005000000258948
26 Jun 2023
Order Approveddisposed
CC005000000258843
11 May 2023
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
2,357 residential projects still under way within 25 km. Step out ring by ring:
Of the 802 projects the radar draws within 6 km — every kind, every stage — 277 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
Complaints before MahaRERA.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/addressone-phase-5-gahunje-mawal-pk5oj5fb.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.