Complete project overview

K-RERA · Registration filing
Units
37 units
Mix
24 × 2BHK · 9 × 3BHK · 4 × 1BHK
Booked
37 of 37 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,224 sq m
Floor area
3,209 sq m
Description
ADORA AVRITI

Timeline

RERA registeredAug 2022
Project startedDec 2022
Proposed completionDec 2026
TodayJul 2026
Construction progress

58% overall, as filed

Sanitary Fittings0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc10%
Fire Fighting Fittings and Equipment20%
Electrical Fittings30%
Installation of lifts, water pumps etc30%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings80%
Overhead and Underground Water Tanks.80%
Staircases, Lifts Wells90%
The external plumbing and external plastering90%
Completion of terraces floor each building90%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 37 available
TypeArea sq mAvailable
3BHK670 of 8
1BHK270 of 4
2BHK540 of 4
2BHK540 of 4
3BHK930 of 1
2BHK530 of 4
2BHK500 of 4
2BHK580 of 4
2BHK550 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

ADORA HOMES PRIVATE LIMITED

CompanyPromoter type
Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
4Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
182 homeson the public record across 4 projects
19,287 sq mbuilt-up filed
5,750 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporationthis project3 of 4 projects
Puthur Grama PanchayatGrama Panchayat1 of 4 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KOTTIL ROAD
Village
ARANATTUKARA
Taluk
Thrissur
District
Thrissur
Pincode
680012
Survey no.
291,295-1
Patta no.
1796
What’s nearby
Schools1 school within 500m · Library 501m away
HealthcareHospital 795m away · 1 clinic within 1km · Doctor's clinic within 1km
LifestylePark 1.3km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 404m away · Mall 376m away · Convenience store within 500m
Getting around
Primary road 402 m · Thrissur - Kanjani - Vadanappally RoadRailway line 3.3 kmRailway station 3.4km away (Thrissur)Bus stop within 500m
Water & environment
Water body 305 m · ParakulamRiver 1.2 km · Puzhakkal River
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 20 Jun 2022 · 4 yrs ago
Building Permit no. AYL/BA/181/21-22Survey no. 291,295-1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan AYL/BA/181/21-22 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.