This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
23 units
Mix
12 × 3 BHK · 10 × Shop · 1 × Hall
Carpet area
11–128 sq mper-unit range, as filed
Floors
7
Land area
483 sq m
Sanctioned built-up
1,678 sq m
Timeline
RERA registeredFeb 2023
Proposed completionDec 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
23 units across 9 batches
TypeArea sq mCount
3 BHK1096
3 BHK1281
Shop164
Shop111
Shop153
Shop151
Shop201
Hall331
3 BHK1095
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools2 schools within 500m · 3 educational institutions within 1km · College or university 1.6km away
HealthcareHospital 193m away · 6 clinics within 1km · Pharmacy within 500m
LifestylePark 1.2km away · Gym or sports centre 773m away · 55+ restaurants and cafes within 1km
ShoppingSupermarket 66m away · Mall 35m away · Convenience store within 500m
Getting around
Expressway 3.6 kmPrimary road 2 m · Cotton Market RoadRailway line 569 mRailway station 615m away (Amravati)Limited bus connectivity nearby
Water & environment
River 866 mWater body 1.6 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹21,154per sq yd
₹25,300per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 19 divisions of “Amravati (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹16,689 – ₹27,960 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Amravati Municipal Corporation
Municipal Corporation
Building Permit
Survey no. PLOT NO 8 S NO 42/3
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Amravati Municipal Corporation
Municipal corporation
Has approved 57 RERA projects — 0.3% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
56
On record
467 flats · 0 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
SM12500070
13 Jun 2025
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
74 residential projects still under way within 25 km. Step out ring by ring:
Of the 246 projects the radar draws within 6 km — every kind, every stage — 69 are residential projects still under way. This list keeps only those, and looks further out.
6 projects within 1 km — showing the nearest 6.
10 m awayResidential / Group Housing
SAI SAGAR ENCLAVE XIV
SAGAR PANDHARINATH BANKAR · Amravati
4 yr 3 mo
Dec 2022registered
Mar 2027target completion
Government Guidance Rate₹21,154/sq ydScale21 flatsAuthorityMahaRERA
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
Complaints before MahaRERA.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/advik-nutan-residency-amravati-m-corp-d3zm2sh0.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.