This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
NANDADEEP APARTMENT
Units
14 units
Mix
14 × 3 BHK
Carpet area
81 sq mper-unit range, as filed
Floors
9
Parking
1 spaces
Land area
431 sq m
Sanctioned built-up
1,544 sq m
Timeline
RERA registeredSep 2021
Proposed completionMar 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
14 units across 1 batch
TypeArea sq mCount
3 BHK8114
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Amravati (M Corp.)
Taluka
Amravati
District
Amravati
Pincode
444606
Survey no.
NAZUL PLOT NO 2/36,NAZUL SHEET NO 45A, MOUJE RAJAPEHT, AMRAVATI
North boundary
12 M ROAD
East boundary
SERVICE LANE
South boundary
RESIDENCE ON OTHER PLOT
West boundary
12 M ROAD
What’s nearby
Schools1 school within 1km · College or university 1.6km away · Library 1.2km away
HealthcareHospital 21m away · 10 clinics within 1km · Pharmacy within 1km
LifestylePark 1.3km away · Gym or sports centre 1.3km away · 20+ restaurants and cafes within 1km
ShoppingSupermarket 680m away · Mall 216m away · Convenience store within 500m
Getting around
Expressway 2.2 km · Amravati BypassPrimary road 355 m · Amravati Paratwada RoadRailway line 265 mRailway station 1.2km away (Amravati)Limited bus connectivity nearby
Water & environment
River 2.3 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹21,154per sq yd
₹25,300per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 19 divisions of “Amravati (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹16,689 – ₹27,960 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Amravati Municipal Corporation
Municipal Corporation
Building Permit
Survey no. NAZUL PLOT NO 2/36,NAZUL SHEET NO 45A, MOUJE RAJAPEHT, AMRAVATI
The promised possession date (31 Mar 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Amravati Municipal Corporation
Municipal corporation
Has approved 57 RERA projects — 0.3% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
56
On record
467 flats · 0 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
74 residential projects still under way within 25 km. Step out ring by ring:
Of the 216 projects the radar draws within 6 km — every kind, every stage — 52 are residential projects still under way. This list keeps only those, and looks further out.