10 on filequarterly progress reports filed with RERA
Timeline
RERA registeredNov 2023
Proposed completionOct 2028
TodaySep 2026
Construction progress
90% overall, as filed
Gym0%
Swimming Pool0%
Treatment And Disposal Of Sewerage And Sullage Wat85%
Water Conservation Rain Water Harvesting85%
Club House85%
Community Buildings88%
Water Supply90%
Sewerage90%
Storm Water Drains90%
Landscaping And Tree Planting90%
Open Parking90%
Boundary Wall90%
Security Service90%
Internal Roads And Footpaths95%
Street Lighting95%
Place Of Worship100%
From the builder's latest quarterly progress report filed with RERA Chhattisgarh — % complete overall and per infrastructure work, as of that filing. A dated snapshot, not a live tracker.
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
198 plots across 73 batches
TypeArea sq mCount
Plot3862
Plot4121
Plot3911
Plot3852
Plot3851
Plot2212
Plot2641
Plot2043
Plot5111
Plot3871
Plot3241
Plot2721
Plot2701
Plot2561
Plot2491
Plot2411
Plot2411
Plot2251
Plot2271
Plot2291
Plot2321
Plot2351
Plot2541
Plot2361
Plot2031
Plot1971
Plot1911
Plot2382
Plot2383
Plot2351
Plot2271
Plot2181
Plot1971
Plot3221
Plot22392
Plot2771
Plot395
Plot471
Plot431
Plot361
Plot401
Plot402
Plot441
Plot431
Plot431
Plot421
Plot411
Plot1591
Plot971
Plot10010
Plot2612
Plot3042
Plot2652
Plot2624
Plot2891
Plot3911
Plot2733
Plot2572
Plot2381
Plot3242
Plot2341
Plot3312
Plot2791
Plot2421
Plot2781
Plot2371
Plot3082
Plot2561
Plot2061
Plot2181
Plot2331
Plot2481
Plot2281
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
24 homes · 207 plotson the public record across 4 projects
₹126.66 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.8 kmPrimary road 2.4 km · V.I.P. RoadRailway line 632 mRailway station 3.2km away (Telibandha)Limited bus connectivity nearby
Water & environment
Canal 1.4 kmWater body 1.6 kmRiver 1.8 km
distances only — not a flood assessment
Land, title & encumbrance
Mortgage19 unit(s) declared under mortgage to a bank/lender for project finance
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹69.45 Cr declared to build 198 plots. What that works out to:
₹35.07 Lakhdeclared cost per plotall-in — land + construction
31%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
The yearly satellite view ends in 2023 and this project started in 2023, so it does not cover this project's construction: the site was still open ground within ~40 m of the recorded location when the series ends. The 2026 image shows the site more recently.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Mar 2017Jan 2023Jan 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
The yearly site view ends in 2023, before this project started in 2023.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Chhattisgarh registration department
In Chhattisgarh it’s called the collector guideline rate.
No government guidance rate is shown for this project.
Chhattisgarh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Complaints & litigation
RERA Chhattisgarh · public record
Complaints, as the builder reports them
None in the builder’s latest quarterly return to RERA Chhattisgarh.
The builder’s own count of grievances it received — not RERA Chhattisgarh’s register, which isn’t published. Cases the builder declares are listed below.
What the builder declared
Declared to RERA Chhattisgarh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Chhattisgarh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Chhattisgarh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
169 plotted projects still under way within 25 km. Step out ring by ring:
Of the 469 projects the radar draws within 6 km — every kind, every stage — 66 are plotted projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Chhattisgarh's published schedules.
06Complaints & litigation
RERA Chhattisgarh's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/ambience-nature-raipur-tl36rusd.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.