The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Part of S Nos 112, 113, 114/1, 114/2, 115/1, 115/2, 116, 133/1, 133/2, 134, 135 of village Kune Nama
North boundary
15 meter wide road and portion of Amoda Reserve
East boundary
24 meter wide old district road and amenity space
South boundary
Open Space
West boundary
15 meter wide Road
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 4.8km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 3.4 kmRailway line 2.0 km · Tunnel 43Railway station 4.2km away (Khandala)Limited bus connectivity nearby
Water & environment
Water body 1.3 kmRiver 1.3 km · Ulhas
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~80 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~80 m of the filed location.
Satellite photographs of the same ground
Feb 2017Mar 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~80 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate sits 3-10 km from other projects with the same pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Pune Metropolitan Region Development Authority
Metropolitan Development Authority
Building Permit
Survey no. Part of S Nos 112, 113, 114/1, 114/2, 115/1, 115/2, 116, 133/1, 133/2, 134, 135 of village Kune Nama
The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pune Metropolitan Region Development Authority
Metropolitan / development authority
Has approved 1,013 RERA projects — about 1 in 20 in Maharashtra.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
Builders
604
On record
21,940 flats · 10,299 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC005000000064480
6 Aug 2020
Order Approveddisposed
Court cases, as declared
Declared by the builder
1 case
Number
Forum
Date
999
Civil Court Senior Division
2006
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
137 residential projects still under way within 25 km. Step out ring by ring:
Of the 110 projects the radar draws within 6 km — every kind, every stage — 28 are residential projects still under way. This list keeps only those, and looks further out.
2 projects between 1 and 3 km — showing the nearest 2.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
Complaints before MahaRERA.
Court cases, as declared by the builder, in its MahaRERA filing.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/amoda-reserve-south-park-kune-n-m-mawal-b5s828jq.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.