HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

ARWADE ALTIA

P53100017830 · MahaRERA · https://gethorizon.in/projects/arwade-altia-sangli-miraj-kupwad-m-5e4mr37s

01

Complete project overview

MahaRERA · Registration filing
Project name
ARWADE ALTIA
Units
35 units
Mix
11 × 2 BHK · 10 × Shop · 7 × Office · 4 × 1 RK · 3 × 1 BHK
Carpet area
15–126 sq mper-unit range, as filed
Floors
7
Parking
15 spaces
Land area
988 sq m
Sanctioned built-up
1,413 sq m

Timeline

RERA registeredSep 2018
Proposed completionJun 2021
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

35 units across 14 batches
TypeArea sq mCount
Office163
Shop262
Office272
Office712
2 BHK548
Shop154
Shop431
Shop272
Shop261
1 BHK243
2 BHK1261
2 BHK432
1 RK262
1 RK272

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

mrk infracon

PartnershipPromoter type
Sangli, MAHARASHTRABased in
1Projects
1City
2018–2021Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 5 new projects last year
  • 124 nearby projects
1 km radius · coordinates as filed · 16.8419, 74.6693 · © OpenStreetMap contributors
Village
Sangli Miraj Kupwad (M Corp.)
Taluka
Miraj
District
Sangli
Pincode
416416
Survey no.
CTS NO 1078
North boundary
CTS NO 1079
East boundary
ROAD
South boundary
CTS NO 1077
West boundary
ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 359m away · 1 clinic within 1km
LifestylePark 1.7km away
ShoppingNo supermarket within 2km
Getting around
Expressway 759 m · Tasgaon Phata -Subhash Nagar RoadPrimary road 2.9 km · Shivaji RoadRailway line 3.1 kmRailway station 3.3km away (Bolwad)Limited bus connectivity nearby
Water & environment
Water body 2.5 km · Ganesh Talav
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~20 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Jan 2017
Apr 2023
Apr 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate sits 3-10 km from other projects with the same pincode.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

07

Other projects nearby

The register · within 25 km

107 residential projects still under way within 25 km. Step out ring by ring:

Of the 124 projects the radar draws within 6 km — every kind, every stage — 25 are residential projects still under way. This list keeps only those, and looks further out.

10 projects between 1 and 3 km — showing the nearest 6.

1.8 km awayResidential / Group Housing

Agrawal Exotica

MR AGRAWAL NILESH NEMICHAND (HUF) · Sangli Miraj Kupwad · Miraj

Jul 2023registered
Mar 2026target completion
Scale21 flatsAuthorityMahaRERA
1.8 km awayOthers

YELKOT VISION

YELKOT BUILDERS PVT LTD · Sangli Miraj Kupwad · Miraj

Oct 2024registered
Dec 2027target completion
Scale40 flatsAuthorityMahaRERA
1.9 km awayResidential / Group Housing

SAMRAJYA SIDDHI

SIDDHINIRMAN DEVELOPERS LLP · Sangli Miraj Kupwad · Miraj

Feb 2026registered
Dec 2030target completion
Scale27 flatsAuthorityMahaRERA
2.3 km awayResidential / Group Housing

Digambar Residency

SATYAJIT GOVIND LELE · Sangli Miraj Kupwad · Miraj

Jan 2024registered
Dec 2027target completion
Scale33 flatsAuthorityMahaRERA
2.4 km awayResidential / Group Housing

TRIMURTI RESIDENCY

VIVEK RANGRAO PATIL · Sangli Miraj Kupwad · Miraj

Jan 2026registered
Mar 2028target completion
Scale32 flatsAuthorityMahaRERA
2.7 km awayOthers

SHREE RAM SRUSHTI

SHREE ASSOCIATES · Sangli Miraj Kupwad · Miraj

Nov 2023registered
Aug 2027target completion
Scale67 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/arwade-altia-sangli-miraj-kupwad-m-5e4mr37s.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.