HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
26 units
Mix
16 × 2BHK · 10 × 3BHK
Booked
14 of 26 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,084 sq m
Floor area
3,967 sq m
Description
ARYA

Timeline

Project startedApr 2019
RERA registeredAug 2021
Proposed completionMar 2022
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

12 of 26 available
TypeArea sq mAvailable
2BHK5600 of 5
2BHK5275 of 5
3BHK5243 of 4
3BHK5213 of 4
2BHK2171 of 2
2BHK2110 of 2
2BHK1930 of 2
3BHK2660 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Chothy's Building Promoters Pvt Ltd

CompanyPromoter type
Thiruvananthapuram, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
9Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
194 homes · 185 plotson the public record across 9 projects
33,266 sq mbuilt-up filed
48,949 sq mplotted area
56,991 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Government Of KeralaLocal body (LSGI)this project3 of 9 projects
Trivandrum Municipal CorporationMunicipal Corporation3 of 9 projects
Pothencode Grama PanchayatGrama Panchayat1 of 9 projects
Trivandrum Muncipal Municipal CorporationMunicipal Corporation1 of 9 projects
Vilavoorkkal Grama PanchayatGrama Panchayat1 of 9 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
METTUKADA
Village
THYCAUD
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695014
Survey no.
5/86
Patta no.
14919 14980
What’s nearby
SchoolsNearest school 1.4km away · 8 educational institutions within 1km · College or university 617m away
HealthcareHospital 398m away · Clinic within 2km
LifestylePark 1.4km away · Gym or sports centre 1.6km away · 18+ restaurants and cafes within 1km
ShoppingSupermarket 376m away · Mall 1.3km away · Convenience store within 1km
Getting around
Expressway 2.9 kmPrimary road 49 m · Thiruvanathapuram - Thenmala RoadRailway line 473 mRailway station 716m away (Thiruvananthapuram Central)17 bus stops within 500m
Water & environment
River 461 m · Killi
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Government Of Kerala

Local body (LSGI)
approved 28 Sep 2018 · 7 yrs ago
Building Permit no. E6/BA/189722816Survey no. 5/86

The promised possession date (29 Mar 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan E6/BA/189722816 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.