HORIZON
Share

ASHIANA DEV KUNJ

BRERAP00519-3/709/R-670/2019 · RERA Bihar · https://gethorizon.in/projects/ashiana-dev-kunj-patna-sadar-hjrap43u

01

Complete project overview

RERA Bihar · Registration filing
Project name
ASHIANA DEV KUNJ
Units
20 units
Unit mix
12 × 3 BHK · 8 × 2 BHK
Parking
20 spaces
Land area
1,370 sq m
Built-up area
2,473 sq m

Timeline

Project startedNov 2018
RERA registeredJun 2019
Proposed completionSep 2021
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

20 units across 2 batches
BuildingTypeArea sq mCount
ASHIANA DEV KUNJ2 BHK618
ASHIANA DEV KUNJ3 BHK12412

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

ASHIANA ESTATES PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
2Projects
1Cities
2019–2021Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
40 homeson the public record across 2 projects
3,969 sq mbuilt-up filed
2,126 sq mland declared
₹9.80 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ASHIANA ESTATES PRIVATE LIMITED— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
Anchal (block)
Patna Sadar
Mauja (revenue village)
Dhirachaka
Address
DHIRACHAK,
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 2.0km away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 177m away
ShoppingNo supermarket within 2km · Bank 926m away
Getting around
Expressway 99 mPrimary road 341 m · Chitkohara FlyoverRailway line 197 m · Howrah - Delhi RailwayRailway station 1.9km away (Phulwari Sharif)Limited bus connectivity nearby
Water & environment
Water body 582 m · Maanikchand TalaabCanal 789 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.04 Cr declared to build 20 flats. What that works out to:

₹25.20 Lakhdeclared cost per flatall-in — land + construction
₹1,893/sq ftof built-up area₹20,379/sq m
21%of the cost is land₹705/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹22,727per sq yd
₹27,182per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Dhirachak”.
Highest rate
₹24,793 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹27,182 / sq m₹22,728 / sq yd
Res. Main Road₹29,653 / sq m₹24,794 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (30 Sep 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

362 residential projects still under way within 25 km. Step out ring by ring:

4 projects within 1 km — showing the nearest 4.

Patna SadarResidential/Group Housing

Patliputra Residency

PATLIPUTRA ENGINEERS PRIVATE LIMITED

Oct 2024registered
Mar 2029target completion
Declared cost₹4.01 CrScale12 flatsAuthorityRERA Bihar
Patna SadarResidential/Group Housing

BRAJ RADHIKA BHAWAN

DYNAMIC AWAS PRIVATE LIMITED

Jul 2025registered
Aug 2029target completion
Declared cost₹3.50 CrScale16 flatsAuthorityRERA Bihar
CHITKOHRAResidential/Group Housing

SAI HEIGHTS

SAI SHIV GANAPATI HERITAGE PRIVATE LIMITED

Oct 2025registered
Mar 2029target completion
Declared cost₹19.25 CrScale40 flatsAuthorityRERA Bihar
BHIKHACHAKResidential/Group Housing

DOWN TOWN 2

SHREE MAHAVIRA BUILDWELL PRIVATE LIMITED

May 2020registered
Nov 2026target completion
Declared cost₹31.21 CrScale64 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.