HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

AVNIT PLAZA

P52000051924 · MahaRERA · https://gethorizon.in/projects/avnit-plaza-neral-karjat-fyd2tguh

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
15 units
Floors
4
Buildings
2
Parking
14 spaces
Land area
319 sq m
Sanctioned built-up
561 sq m

Timeline

RERA registeredJul 2023
Proposed completionOct 2024
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

AVNIT ENTERPRISE

PartnershipPromoter type
Raigarh, MAHARASHTRABased in
1Projects
1City
2023–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 19.0372, 73.3097 · © OpenStreetMap contributors
Village
Neral
Taluka
Karjat
District
Raigarh
Pincode
410101
Survey no.
156/1
North boundary
Adj plot number 13
East boundary
Adj plot number 12
South boundary
6 M W Internal road
West boundary
Adj plot number 3
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.0km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 660 m · Karjat RoadRailway line 946 m · Mumbai-Pune RailwayRailway station 1.4km away (Neral Junction)Limited bus connectivity nearby
Water & environment
Water body 708 mRiver 761 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Raigad Zilla Parishad Alibaug

Building Permit
Survey no. 156/1

The promised possession date (31 Oct 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

1,272 residential projects still under way within 25 km. Step out ring by ring:

18 projects within 1 km — showing the nearest 6.

NeralResidential / Group Housing

TOWER C-MARS,PLUTO

DREAMZ REALTY

Jul 2023registered
Dec 2030target completion
Scale96 flatsAuthorityMahaRERA
MamdapurResidential / Group Housing

KAILASH COMPLEX PHASE 2

BRAMHA CONSTRUCTIONS

Mar 2024registered
Mar 2027target completion
AuthorityMahaRERA
MamdapurMixed

ARENA ONE

TECTRA ENGINEERING

Aug 2026registered
Dec 2028target completion
Scale46 flatsAuthorityMahaRERA
NeralMixed

ASMA TOWER

MUJEEB BADRUDDIN ANSARI

Oct 2025registered
Dec 2029target completion
Scale32 flatsAuthorityMahaRERA
MamdapurResidential / Group Housing

SUKOON RESIDENCY

RIFAA STRUCTURAL SOLUTIONS PRIVATE LIMITED

Jun 2022registered
Jun 2027target completion
Scale77 flatsAuthorityMahaRERA
MamdapurOthers

ZAINAB HEIGHTS

SHALIN DEVELOPERS

Jun 2024registered
Dec 2026target completion
Scale33 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/avnit-plaza-neral-karjat-fyd2tguh.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.