HORIZON
Share

BALDEV BHAWAN

BRERAP31259-1/60/R-1238/2021 · RERA Bihar · https://gethorizon.in/projects/baldev-bhawan-patna-sadar-epfraozw

01

Complete project overview

RERA Bihar · Registration filing
Project name
BALDEV BHAWAN
Units
23 units
Unit mix
23 × 3 BHK
Parking
23 spaces
Land area
1,139 sq m
Built-up area
2,236 sq m

Timeline

Project startedAug 2021
RERA registeredNov 2021
Proposed completionDec 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

23 units across 8 batches
BuildingTypeArea sq mCount
BALDEV BHAWAN3 BHK2813
BALDEV BHAWAN3 BHK4212
BALDEV BHAWAN3 BHK2383
BALDEV BHAWAN3 BHK2683
BALDEV BHAWAN3 BHK2843
BALDEV BHAWAN3 BHK2623
BALDEV BHAWAN3 BHK3093
BALDEV BHAWAN3 BHK3043

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

BHUWANESHWARI ENGICONS PVT LTD

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2021–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Patna Sadar
Mauja (revenue village)
Dhakanpur
Address
PLOT NO-646P THANA NO-07 MAUZA -DHAKANPURA SHASTRI NAGAR PUNICHAK PATNA
What’s nearby
Schools2 schools within 500m · 3 educational institutions within 1km · College or university 1.5km away
HealthcareHospital 601m away · 5 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 776m away · 13+ restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Mall 1.0km away · Bank 725m away
Getting around
Expressway 698 m · Bailey RoadPrimary road 526 m · Atal Path FlyoverRailway line 1.8 km · Howrah - Delhi RailwayRailway station 1.8km away (Sachiwalaya)Limited bus connectivity nearby
Water & environment
Canal 1.1 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹2.52 Cr declared to build 23 flats. What that works out to:

₹10.93 Lakhdeclared cost per flatall-in — land + construction
₹1,045/sq ftof built-up area₹11,249/sq m
1%of the cost is land₹12/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹42,355per sq yd
₹50,657per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Dhakan Pura”.
Highest rate
₹46,488 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹50,657 / sq m₹42,356 / sq yd
Res. Main Road₹55,599 / sq m₹46,488 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

359 residential projects still under way within 25 km. Step out ring by ring:

6 projects within 1 km — showing the nearest 6.

PatnaResidential

KRISHNA SAVITRI GARDENS

KASTCRETE BUILDMAT PRIVATE LIMITED

May 2024registered
Jan 2029target completion
Declared cost₹13.95 CrAuthorityRERA Bihar
Patna SadarResidential/Group Housing

Saraswati Niwas

VARADVINAYAK HOMES

Aug 2026registered
Apr 2032target completion
Declared cost₹6.12 CrAuthorityRERA Bihar
Patna SadarResidential/Group Housing

SHREE GANESH SANDHYA ALPNA ENCLAVE

ORB DEVELOPER PRIVATE LIMITED

Jul 2026registered
Sep 2031target completion
Declared cost₹3.55 CrAuthorityRERA Bihar
Patna SadarResidential/Group Housing

GLAMCO S SINHA SADAN

GLAMCO EXIM PRIVATE LIMITED

Jun 2025registered
Dec 2029target completion
Declared cost₹5.00 CrScale10 flatsAuthorityRERA Bihar
PATEL NAGARResidential/Group Housing

SHAIL SHANTI APARTMENT

DISHA ABHYUDAYA BUILDERS PRIVATE LIMITED

May 2026registered
Jul 2028target completion
Declared cost₹2.46 CrAuthorityRERA Bihar
PatnaResidential

NITYA HOMES

N S A CONSTRUCTION PRIVATE LIMITED

Aug 2023registered
Jul 2028target completion
Declared cost₹5.88 CrAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.