HORIZON
Share

BHAGWATI BELLEZA

P52000045869 · MahaRERA · https://gethorizon.in/projects/bhagwati-belleza-ulawe-panvel-h7wscmtv

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
97 units
Mix
18 × Flat Type 5 · 16 × Flat Type 1 · 10 × Flat Type 2 · 9 × Flat Type 3 · 8 × Shop · 8 × Office · 7 × Flat Type 4 · 7 × Flat Type 6 · 2 × Flat Type 13 · 2 × Flat Type 14 · 2 × Flat Type 9 · 2 × Flat Type 12 · 2 × Flat Type 11 · 1 × Flat Type 7 · 1 × Flat Type 15 · 1 × Flat Type 10 · 1 × Flat Type 8
Carpet area
41–62 sq mper-unit range, as filed
Floors
15
Parking
72 spaces
Land area
2,274 sq m
Sanctioned built-up
5,117 sq m
Recreational open space
63 sq m

Timeline

RERA registeredJun 2022
Proposed completionMar 2026
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

97 units across 23 batches
TypeArea sq mCount
Flat Type 7611
Flat Type 13522
Flat Type 14542
Flat Type 9592
Flat Type 15511
Flat Type 10551
Flat Type 55518
Flat Type 12602
Shop532
Flat Type 16116
Flat Type 3609
Flat Type 4567
Flat Type 26210
Flat Type 6567
Flat Type 8551
Flat Type 11542
Office471
Shop512
Shop474
Office414
Office471
Office451
Office451

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

M/S BHAGWATI VENTURES

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2022–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Ulawe
Taluka
Panvel
District
Raigarh
Pincode
410206
Survey no.
PLOT NO 182 SECTOR 20
North boundary
PLOT NO 181
East boundary
PROPOSED 30 MTRS WIDE ROAD
South boundary
PLOT NO 183
West boundary
PLOT NO 172 TO 174
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.2km away
LifestyleNo parks within 2km · Gym or sports centre 414m away
ShoppingNo supermarket within 2km
Getting around
Expressway 767 mPrimary road 2.1 km · Panvel Uran RoadRailway line 415 m · Uran LineRailway station 4.6km away (CBD Belapur)2 bus stops within 500m
Water & environment
Canal 304 mWater body 363 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,220 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,056 projects the radar draws within 6 km — every kind, every stage — 313 are residential projects still under way. This list keeps only those, and looks further out.

48 projects within 1 km — showing the nearest 6.

10 m awayOthers

JUPITER ROYAL

ARJUN ASHOK TARACHANDANI · Ulawe · Panvel

Jan 2023registered
Nov 2026target completion
Scale39 flatsAuthorityMahaRERA
190 m awayResidential / Group Housing

CHAITANYA RESIDENCY

DHANAJI SAMPAT KATKAR · Ulawe · Panvel

Aug 2024registered
Dec 2026target completion
Scale8 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

PATEL AURA

MAHAVIR DEVELOPERS · Ulawe · Panvel

Oct 2024registered
Aug 2026target completion
Scale45 flatsAuthorityMahaRERA
230 m awayOthers

Trimurti Residence

Destiny Developers · Wahal · Panvel

Dec 2024registered
Dec 2028target completion
Government Guidance Rate₹53,094/sq ydScale45 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

Green Park

SHREE SHIV ENTERPRISES · Ulawe · Panvel

Jan 2026registered
Dec 2028target completion
Scale40 flatsAuthorityMahaRERA
240 m awayResidential / Group Housing

VARAD VINAYAK

VIRAT AND SANSKAR GROUP · Wahal · Panvel

May 2024registered
Jun 2026target completion
Government Guidance Rate₹53,094/sq ydScale32 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.