Registration for Proposed construction of High Rise Group Development with Extended 2nd Basement Floor for Block – 1, Combined Extended 1st Basement Floor for Block – 1,2 & 3; Block 1: Ground Floor + 26 Floors (188 Dwelling Units), Block 2: Ground Floor + 26 Floors (188 Dwelling Units), Block 3: Ground Floor + 28 Floors (168 Dwelling Units) with Club House at Ground Floor and Open Swimming Pool, (Totally 544 Dwelling Units), Ambattur Puzhal Main Road, Chennai Comprised in Survey Nos: 48/1A1B, 49/1A, 50/1A1, 50/1A2, 50/1B, 50/1C, 50/2A, 50/2B, 52/1A, 52/1B, 52/2A, 52/2B, 52/3A, 52/3B, 52/4B1, 52/4B2, 52/4B3 & 53/3A of Soorapattu Village, Madhavaram Taluk, Chennai District.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
CMDA (Chennai Metropolitan Development Authority)CMDA (Chennai Metropolitan Development Authority)this project3 of 5 projects
Town & Country Planning (DTCP)Town & Country Planning (DTCP)2 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.1 km · Chennai BypassPrimary road 73 mRailway line 4.5 kmRailway station 4.5km away (Korattur)Bus stop within 500m
Water & environment
River 1.2 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
approved 21 May 2026 · 4 mo ago
Planning Permission no. OL-PP/HRB/0020/2026
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan OL-PP/HRB/0020/2026 on the approving authority’s portal to confirm the approval.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
379 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 21 projects the radar draws within 6 km — every kind, every stage — 16 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.
4 projects between 1 and 3 km — showing the nearest 4.