Registration for Plot Nos. 1 - 30 of Ground Floor + 1st Floor with One dwelling unit each and by totally 30 dwelling units at Vetri Nagar , Korattur , Chennai. Comprised in Old S.Nos. 598/1B1A part , 598/1B1A2 , 598/1B1A3 , 598/1B1A4 , 598/2B part , 598/1A1B , T.S.No. 3/16 , Block No. 21 , Ward - E of Korattur Village , Ambattur Taluk , Chennai District.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
TNRERA · Registration filing
What’s nearby
Schools2 schools within 500m
HealthcareHospital 813m away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 655m away · 12+ restaurants and cafes within 1km
ShoppingSupermarket 790m away · Convenience store within 1km · Bank 948m away
Getting around
Expressway 1.3 km · Chennai BypassPrimary road 1.0 km · Jawaharlal Nehru Road (100 Feet Road)Railway line 1.9 kmRailway station 2.1km away (Korattur)2 bus stops within 500m
Water & environment
Water body 479 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
Municipal Corporation
Municipal Corporation
Planning Permissionapproved 31 Oct 2025 · 11 mo ago
The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves within its own limits. It has approved 632 RERA projects — about 1 in 6 in Tamil Nadu.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
403 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 51 projects the radar draws within 6 km — every kind, every stage — 34 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.
2 projects within 1 km — showing the nearest 2.
370 m away
CHANDANA TOWER
Built Tech Associates rep by its partners i) N.Rajendran