Timeline
88% overall, as filed
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from Confident Projects India Pvt Ltd— the full portfolio →
In Kerala it’s called the fair value.
What this number is — and isn’t
The promised possession date (14 Apr 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan BP260/14-15 on the approving authority’s portal to confirm the approval.
A city corporation or municipality that approves building & development permits within its own limits. It has approved 871 RERA projects across 12 districts — about 1 in 2 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
2 complaints
| Number | Forum | Date | |
|---|---|---|---|
| 59/2022 | K-RERA Authority | 2022 | |
| 51/2022 | K-RERA Adjudicating | 2022 |
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
166 residential projects still under way within 25 km. Step out ring by ring:
10 projects between 1 and 3 km — showing the nearest 6.
Confident Projects Residential
SANROYAL BUILDERS AND CONTRACTORS PVT LTD
Confident Projects Residential
ASSET HOMES PRIVATE LIMITED
CORDON CONSTRUCTORS & REALTORS Pvt Ltd
Oceanus Dwellings Pvt Ltd
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.
What this record cannot tell you