HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Construction of 328 EWS t/s S.No. 392 pt village bolinj Tal - Vasai Dist - Palghar - PMAY

P51800028818 · MahaRERA · https://gethorizon.in/projects/construction-of-328-ews-t-s-s-no-392-pt-kalanagar-andheri-co3ab7om

01

Complete project overview

MahaRERA · Registration filing
Project name
Construction of 328 EWS t/s S.No. 392 pt village bolinj Tal - Vasai Dist - Palghar - PMAY
Units
328 units
Mix
328 × 1 BHK
Carpet area
30 sq mper-unit range, as filed
Floors
22
Buildings
2
Parking
60 spaces
Land area
5,000 sq m
Sanctioned built-up
13,000 sq m
Recreational open space
5,000 sq m

Timeline

RERA registeredMar 2021
Proposed completionFeb 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

328 units across 1 batch
TypeArea sq mCount
1 BHK30328

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

ARUN SHANKARRAO BORGAVE

IndividualPromoter type
Mumbai Suburban, MAHARASHTRABased in
2Projects
2Cities
2021–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
2,919 homeson the public record across 2 projects
1,27,515 sq mbuilt-up filed
78,325 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ARUN SHANKARRAO BORGAVE— the full portfolio →

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 19.0577, 72.8504 · © OpenStreetMap contributors
Taluka
Andheri
District
Mumbai Suburban
Pincode
400051
Survey no.
392 PART
North boundary
EXISTING MHADA PROJECT
East boundary
PRIVATE PROPERTY
South boundary
OPEN LAND
West boundary
30 M WIDE DP ROAD
What’s nearby
SchoolsNearest school 1.9km away · College or university 708m away
HealthcareHospital 288m away · 5 clinics within 1km · Pharmacy within 500m
LifestylePark 1.1km away · Gym or sports centre 377m away · 14+ restaurants and cafes within 1km
ShoppingSupermarket 295m away · Mall 1.9km away · Convenience store within 1km
Getting around
Expressway 1.6 kmPrimary road 210 m · Bandra Kurla Complex RoadRailway line 990 mMetro station 554m away (Bandra Kurla Complex (BKC))6 bus stops within 500m
Water & environment
Water body 635 mRiver 664 m · Mithi River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,652 residential projects still under way within 25 km. Step out ring by ring:

25 projects within 1 km — showing the nearest 6.

OthersResidential / Group Housing

Invictus by GS Tower A

TEN X REALTY WEST LIMITED

Nov 2025registered
Aug 2031target completion
Scale62 flatsAuthorityMahaRERA
BandraResidential / Group Housing

Invictus by GS Tower B

TEN X REALTY WEST LIMITED

Nov 2025registered
Aug 2031target completion
Scale56 flatsAuthorityMahaRERA
OthersResidential / Group Housing

Invictus by GS Tower C

TEN X REALTY WEST LIMITED

Nov 2025registered
Aug 2031target completion
Scale91 flatsAuthorityMahaRERA
OthersResidential / Group Housing

Invictus by GS Tower E

TEN X REALTY WEST LIMITED

Nov 2025registered
Aug 2031target completion
Scale26 flatsAuthorityMahaRERA
OthersResidential / Group Housing

Invictus by GS Tower D

TEN X REALTY WEST LIMITED

Nov 2025registered
Aug 2031target completion
Scale26 flatsAuthorityMahaRERA
OthersResidential / Group Housing

Invictus by GS Tower F

TEN X REALTY WEST LIMITED

Nov 2025registered
Aug 2031target completion
Scale26 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/construction-of-328-ews-t-s-s-no-392-pt-kalanagar-andheri-co3ab7om.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.