Complete project overview

K-RERA · Registration filing
Units
40 units
Mix
30 × 3BHK · 10 × 2BHK
Booked
1 of 40 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,096 sq m
Floor area
5,418 sq m
Description
EMMAUS TOWER

Timeline

Project startedSep 2019
RERA registeredApr 2021
Proposed completionJun 2024
TodayJul 2026
Construction progress

87% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

39 of 40 available
TypeArea sq mAvailable
3BHK12219 of 20
3BHK12310 of 10
2BHK9810 of 10

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

BINOY ABRAHAM

Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
100 homeson the public record across 2 projects
16,350 sq mbuilt-up filed
5,426 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
NH 85
Village
KOTHAMANGALAM
Taluk
Kothamangalam
District
Ernakulam
Pincode
686666
Survey no.
1336/1/1 , 1336/2/1, 1336/2/1/5, 1336/1/1/3/2
Patta no.
30661,31775
What’s nearby
Schools1 school within 1km · 3 educational institutions within 1km · College or university 476m away
HealthcareHospital 476m away · Clinic within 2km
LifestylePark 1.7km away · Gym or sports centre 839m away · 5 restaurants and cafes within 1km
ShoppingSupermarket 792m away · Mall 1.5km away · Convenience store within 500m
Getting around
Expressway 8 m · Muvattupuzha-Kothamangalam RoadPrimary road 1.4 km · Aluva - Munnar RoadNo metro or railway within 5km4 bus stops within 500m
Water & environment
Water body 363 mRiver 920 m · kuroor thoduCanal 940 m · PVIP Branch Canal
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Kothamangalam

Local body (LSGI)
approved 20 Sep 2019 · 6 yrs ago
Building Permit no. PW4-BA(265510)/2019, PW2-143/18-19Survey no. 1336/1/1 , 1336/2/1, 1336/2/1/5, 1336/1/1/3/2

The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan PW4-BA(265510)/2019, PW2-143/18-19 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.