The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Mugavade
Taluka
Mulshi
District
Pune
Pincode
412115
Survey no.
Gat No. 600, Village Mugavade, Taluka Mulshi, District Pune 412115
North boundary
Gat No 601 and 873
East boundary
Gat No 873 and 598
South boundary
Gat No 599 and 596
West boundary
Gat No 611 and 608
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.3km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 497 m · Dive GhatPrimary road 4.6 km · Saswad Bopdev Pune RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 775 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹4,206per sq yd
₹5,030per sq m
Which rate
non-agricultural land (plot)
Matched to
The rate published for the village of “Mugavade”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pune Metropolitan Region Development Authority
Metropolitan Development Authority
Layout Permit
Survey no. Gat No. 600, Village Mugavade, Taluka Mulshi, District Pune 412115
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pune Metropolitan Region Development Authority
Metropolitan / development authority
Has approved 1,013 RERA projects — about 1 in 20 in Maharashtra.
an apartments market — 87% apartments · 13% plotted layouts. Layouts like yours are the smaller share here — this body mostly approves apartments.
Builders
604
On record
21,940 flats · 10,299 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
44 plotted projects still under way within 25 km. Step out ring by ring:
Of the 30 projects the radar draws within 6 km — every kind, every stage — 6 are plotted projects still under way. This list keeps only those, and looks further out.
6 projects between 1 and 3 km — showing the nearest 6.