FORUS GAZANIA

Timeline

Project startedJun 2021
RERA registeredJun 2021
Proposed completionDec 2027
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

4 of 44 available
TypeArea sq mAvailable
3BHK1030 of 11
3BHK920 of 6
3BHK1070 of 11
3BHK1062 of 11
2BHK752 of 5

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

FORUS INITIATIVES

PartnershipPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
7Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
152 homes · 22 plotson the public record across 7 projects
28,245 sq mbuilt-up filed
8,991 sq mplotted area
16,059 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporationthis project6 of 7 projects
Vallachira Grama PanchayatGrama Panchayat1 of 7 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
POONKUNNAM
Village
THRISSUR
Taluk
Thrissur
District
Thrissur
Pincode
680002
Survey no.
1674
Patta no.
13197
What’s nearby
Schools1 school within 500m · 7 educational institutions within 1km · College or university 1.3km away
HealthcareHospital 993m away · 3 clinics within 1km · Pharmacy within 500m
LifestylePark 982m away · Gym or sports centre 1.4km away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 142m away · Mall 1.0km away · Bank 67m away
Getting around
Primary road 8 m · Thrissur – Kuttippuram RoadRailway line 858 mRailway station 828m away (Punkunnam)Bus stop within 500m
Water & environment
Water body 340 m · Seetharam Mill Kulam
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 22 Apr 2021 · 5 yrs ago
Building Permit no. DW5/BA/218/20-21Survey no. 1674
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan DW5/BA/218/20-21 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.