HORIZON
Share

GOMTI VILLA

PR/GJ/SURAT/KAMREJ/Surat Urban Development Authority/PAA14944/100325/311227 · GujRERA · https://gethorizon.in/projects/gomti-villa-kamrej-ozaszxl1

01

Complete project overview

GujRERA · Registration filing
Project name
GOMTI VILLA
Plots
44 plots
Mix
44 × Plot
Carpet area
74–126 sq mper-unit range, as filed

Timeline

Project startedOct 2024
RERA registeredMar 2025
Proposed completionDec 2027
TodaySep 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

44 plots across 1 batch
TypeArea sq mCount
Plot8844

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

Rameshbhai Ravjibhai Dobariya

Individual/PropritorshipPromoter type
Surat, GujaratBased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Kamrej
District
Surat
Pincode
394326
Address
BLOCK NO : 617, R.S. NO 738, CITY SURVEY NO : NA738, VILLAGE VAV,
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.7km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.6 kmPrimary road 2.0 kmRailway line 3.1 km · Western Dedicated Freight CorridorNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 2.6 kmRiver 3.0 km
distances only — not a flood assessment
Price analysisdeclared unit prices — not a live asking price

The unit prices the builder filed with the authority:

₹5.10 Lakh – ₹8.65 Lakhdeclared unit pricerange on the filing — not a live asking price

The unit prices as filed with the authority — not a live asking price. What a unit actually sells for, and any premium, sits above this and can move after the filing.

04

Government Guidance Rate

Gujarat registration department

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

No government guidance rate is shown for this project.

Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

GujRERA · Approved building plan

Surat Urban Development Authority

Urban Development Authority
Layout Permitapproved 10 Mar 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Surat Urban Development Authority

Urban Development Authority

Has approved 895 RERA projectsabout 1 in 19 in Gujarat.

a mixed market65% apartments · 35% plotted layouts.

Builders
734
On record
1,12,087 flats · 25,390 plots
Reach
14 talukas
Since
2008

More layout-heavy than Gujarat overall — 35% plots here vs 6% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

408 plotted projects still under way within 25 km. Step out ring by ring:

Of the 354 projects the radar draws within 6 km — every kind, every stage — 104 are plotted projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

190 m awayPlotted Development

KRISHNA BUNGALOWS

HARSHAD GOVINDBHAI HIRPARA AND OTHERS · Kamrej

Jul 2025registered
Dec 2027target completion
Price band₹6.16 Lakh–₹17.05 LakhScale45 plotsAuthorityGujRERA
380 m awayPlotted Development

HAREKRISHNA BUNGLOWS

GHANASHYAMBHOLABHAIPETHANI AND OTHERS · Kamrej

May 2024registered
Dec 2026target completion
Price band₹6.58 Lakh–₹11.07 LakhScale54 plotsAuthorityGujRERA
420 m awayPlotted Development

SAHAJ BUNGLOWS

PAVAN DEVELOPERS · Kamrej

Jul 2023registered
Dec 2026target completion
Declared cost₹4.40 CrScale82 plotsAuthorityGujRERA
710 m awayPlotted Development

ADITYA BUNGALOWS

PATEL ABHIKUMAR ASHWINBHAI AND OTHERS · Kamrej

Oct 2025registered
Dec 2031target completion
Price band₹12.97 Lakh–₹22.30 LakhScale56 plotsAuthorityGujRERA
820 m awayPlotted Development

KUNJ VILLA

NIRMALSINHMAHENDRASINHGOHIL AND OTHERS · Kamrej

Oct 2022registered
Dec 2026target completion
Declared cost₹2.13 CrScale38 plotsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.