GOOD EARTH MODERN TIMES

Timeline

Project startedJun 2019
RERA registeredMar 2021
Proposed completionSep 2023
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

3 of 40 available
TypeArea sq mAvailable
4BHK2191 of 1
4BHK2201 of 12
4BHK1981 of 14
4BHK2000 of 12
4BHK1950 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

GOOD EARTH INDIA INFRA LIMITED

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
108 homeson the public record across 2 projects
42,447 sq mbuilt-up filed
8,520 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Cheranallur Grama Panchayat ErnakulamLocal body (LSGI)1 of 2 projects
Kalamassery MunicipalityMunicipalitythis project1 of 2 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
TVS ROAD (OLD NH)
Village
THRIKKAKARA NORTH
Taluk
Kanayannur
District
Ernakulam
Pincode
683104
Survey no.
452/29-2,452/15-3-2,452/14-4-2,452/14-5-2,452/16-2,452/15-2,452/28,452/15,452/15-4,452/28-2,452/15-2-2,452/29,452/14-4,452/15-3,452/14-4-4,452/17-2,452/20-2,452/21-2,452/16,452/27-2,452/21-3,452/21
Patta no.
36363
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 468m away
HealthcareHospital 182m away · 2 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · Playground within 500m · Gym or sports centre 187m away
ShoppingSupermarket 124m away · Mall 1.7km away · Bank 155m away
Getting around
Expressway 143 mPrimary road 195 m · TVS RoadRailway line 70 mMetro station 485m away (Cochin University)4 bus stops within 500m
Water & environment
Canal 445 m
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Kalamassery Municipality

Municipality
approved 29 Mar 2022 · 4 yrs ago
Building Permit no. BA-463/18Survey no. 452/29-2,452/15-3-2,452/14-4-2,452/14-5-2,452/16-2,452/15-2,452/28,452/15,452/15-4,452/28-2,452/15-2-2,452/29,452/14-4,452/15-3,452/14-4-4,452/17-2,452/20-2,452/21-2,452/16,452/27-2,452/21-3,452/21

The promised possession date (30 Sep 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA-463/18 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Kalamassery Municipality

Municipal corporation / municipality

Has approved 11 RERA projects0.7% of Kerala.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
11
On record
509 flats · 0 plots
Since
2021

More apartment-heavy than Kerala overall — 100% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.