HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
68 units
Mix
68 × 4BHK
Booked
55 of 68 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
5,034 sq m
Floor area
25,584 sq m
Description
GOOD EARTH UMANG

Timeline

RERA registeredJul 2024
Project startedAug 2024
Proposed completionDec 2028
TodayJul 2026
Construction progress

19% overall, as filed

Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Slabs of Super Structure10%
Fire Fighting Fittings and Equipment15%
Staircases, Lifts Wells17%
Stilt Floor80%
Excavation90%
Basement(s) and Plinth90%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

13 of 68 available
TypeArea sq mAvailable
4BHK2023 of 17
4BHK1918 of 34
4BHK2002 of 17

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

GOOD EARTH INDIA INFRA LIMITED

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
108 homeson the public record across 2 projects
42,447 sq mbuilt-up filed
8,520 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Cheranallur Grama Panchayat ErnakulamLocal body (LSGI)this project1 of 2 projects
Kalamassery MunicipalityMunicipality1 of 2 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
NH 66
Village
CHERANALLUR
Taluk
Kanayannur
District
Ernakulam
Pincode
682034
Survey no.
587/25-2-2,587/25-4,587/25-3,587/25-3-2,587/23,587/24,587/25,587/61,587/6
Patta no.
24191
What’s nearby
Schools1 school within 1km · Library 922m away
HealthcareHospital 1.3km away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.1km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 297m away · Mall 1.1km away · Convenience store within 500m
Getting around
Expressway 38 m · Kodungallur-Paravur-Ernakulam HighwayPrimary road 3.3 km · HMT Ring RoadRailway line 3.0 kmRailway station 3.1km away (Idappalli)13 bus stops within 500m
Water & environment
Canal 309 mWater body 386 mRiver 438 m · Muttar River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Cheranallur Grama Panchayat Ernakulam

Local body (LSGI)
approved 22 May 2024 · 2 yrs ago
Building Permit no. C4-BA(171457)/2024Survey no. 587/25-2-2,587/25-4,587/25-3,587/25-3-2,587/23,587/24,587/25,587/61,587/6
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan C4-BA(171457)/2024 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.