Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
10 units across 1 batch
TypeArea sq mCount
Residential Flats10510
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
BEHIND KTM SHOW ROOM NEAR 150 FEET RING ROAD SURYODAY STREET NO 2 AMIN MARG RAJKOT
What’s nearby
SchoolsNearest school 1.1km away · College or university 1.2km away
HealthcareHospital 381m away · Clinic within 2km
LifestyleNo parks within 2km · Swimming pool within 2km
ShoppingSupermarket 1.4km away · Bank 716m away
Getting around
Expressway 530 m · 150 Foot Ring RoadPrimary road 488 m · Kalawad RoadRailway line 946 m · Rajkot–SomnathRailway station 1.5km away (Bhaktinagar)Limited bus connectivity nearby
Water & environment
Water body 1.5 km · Water Tank
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹3.95 Cr declared to build 10 flats. What that works out to:
₹30.00 Lakhdeclared unit pricerange on the filing — not a live asking price
₹39.51 Lakhdeclared cost per flatall-in — land + construction
₹3,495/sq ftof carpet area₹37,618/sq m
38%of the cost is land₹3,496/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat registration department
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Rajkot Municipal Corporation
Municipal / Corporation
Building Permitapproved 3 Jan 2020 · 6 yrs ago
The promised possession date (30 Sep 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 30 Sep 2021)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Rajkot Municipal Corporation
Municipal Corporation
Has approved 1,120 RERA projects — about 1 in 15 in Gujarat.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
910
On record
83,645 flats · 1,612 plots
Reach
2 talukas
Since
2011
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Number
Date
GJ/CMP/NCQR/Rajkot/211230/0527
30 Dec 2021
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
411 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,586 projects the radar draws within 6 km — every kind, every stage — 327 are residential projects still under way. This list keeps only those, and looks further out.
No government guidance rate could be matched to this project from Gujarat's published schedules.
05Planning authority
GujRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
Complaints on GujRERA's register.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/green-heaven-appartment-rajkot-2hc4zk7v.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.