Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
36 units across 2 batches
TypeArea sq mCount
Residential8,27918
Commercial58518
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Amravati (M Corp.)
Taluka
Amravati
District
Amravati
Pincode
444601
Survey no.
PLOT NO. 13, SHEET NO. 24
North boundary
100 FEET WIDE PUBLIC ROAD
East boundary
REMAINING PORTION OF PRIVATE PLOT NO 1-A
South boundary
PLOT OF SANJAY SHANKARRAO JADHAV
West boundary
RESIDENTIAL HOUSE OF SHRI POPLI
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.3km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 921 mRailway line 496 mRailway station 453m away (Khapri)Limited bus connectivity nearby
Water & environment
River 2.8 kmWater body 4.0 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹21,154per sq yd
₹25,300per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 19 divisions of “Amravati (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹16,689 – ₹27,960 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
48 residential projects still under way within 25 km. Step out ring by ring:
Of the 66 projects the radar draws within 6 km — every kind, every stage — 4 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 3 km — showing the nearest 1.
2.4 km awayResidential / Group Housing
Shiv Kailasa Phase II
Om Shivam Buildcon Private Limited · Sondapar · Hingna
5 yr 5 mo
Jul 2021registered
Dec 2026target completion
⚠ 1 open complaintScale1,471 flatsAuthorityMahaRERA