HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

GREEN SQUARE

P51600033730 · MahaRERA · https://gethorizon.in/projects/green-square-bhagur-rural-nashik-xg7gsyyr

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
53 units
Mix
33 × Shop · 16 × 2 BHK · 4 × 3 BHK
Carpet area
16–136 sq mper-unit range, as filed
Floors
4
Buildings
3
Parking
40 spaces
Land area
3,596 sq m
Sanctioned built-up
1,798 sq m

Timeline

RERA registeredMar 2022
Proposed completionFeb 2025
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

53 units across 16 batches
TypeArea sq mCount
Shop461
Shop3411
Shop1615
Shop202
Shop222
Shop272
2 BHK511
2 BHK512
3 BHK872
2 BHK781
2 BHK652
2 BHK652
2 BHK1362
3 BHK1101
2 BHK1006
3 BHK1081

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

TRUE VISION DEVELOPERS LLP

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 8 new projects last year
  • 88 nearby projects
≈ locality centre · geocoded, verified · 19.8799, 73.8332 · © OpenStreetMap contributors
Village
Bhagur Rural
Taluka
Nashik
District
Nashik
Pincode
422502
Survey no.
438
North boundary
PUBLIC ROAD JUTLAND AVENUE ROAD
East boundary
REST CAMP ROAD BHAGUR ROAD
South boundary
ADJ REVENUE SURVEY NO 439
West boundary
ADJ REVENUE SURVEY NO 441
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 249m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Railway line 184 mRailway station 1.9km away (Devlali)Limited bus connectivity nearby
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

1,068 residential projects still under way within 25 km. Step out ring by ring:

Of the 88 projects the radar draws within 6 km — every kind, every stage — 26 are residential projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

DeolaliResidential / Group Housing

YAMUNA PARK

YAMUNA GREENS BUILDCON

Mar 2025registered
Dec 2028target completion
Scale44 flatsAuthorityMahaRERA
BhagurResidential / Group Housing

ARKK PUSHP PHASE II

VIJAY LALJIBHAI CHHEDA

Mar 2021registered
Jun 2026target completion
Government Guidance Rate₹20,050/sq ydScale52 flatsAuthorityMahaRERA
Bhagur RuralOthers

KUBER NAGARI APARTMENT

MANOJ BUILDERS

Aug 2019registered
Dec 2026target completion
Scale48 flatsAuthorityMahaRERA
Bhagur RuralMixed

Lila Heights

Yamuna Construction

Feb 2026registered
Dec 2028target completion
Scale32 flatsAuthorityMahaRERA
DeolaliOthers

SHREE KARTIKEYA PHASE 2

NIRMITI INFRA

Feb 2024registered
Oct 2026target completion
Scale22 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/green-square-bhagur-rural-nashik-xg7gsyyr.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.