HORIZON
Share

HILL GREEN

P52100077402 · MahaRERA · https://gethorizon.in/projects/hill-green-mohammadwadi-haveli-poxaomjb

01

Complete project overview

MahaRERA · Registration filing
Units
100 units
Floors
14
Buildings
2
Parking
177 spaces
Land area
2,185 sq m
Sanctioned built-up
7,664 sq m

Timeline

RERA registeredAug 2024
Proposed completionDec 2027
TodaySep 2026
Construction progress
Podiums0%
Stilt floor0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Internal finishes10%
Superstructure25%
Excavation100%
Basement (if any)100%
Plinth100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

DATTARAJ BUILDCON

CompanyPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
MOHAMMADWADI
Taluka
Haveli
District
Pune
Pincode
411060
Survey no.
55/1/2/2A (part) + 55/1/2/2B (part)
North boundary
MR THOMAS LAND AND EADVINE PROPERTY
East boundary
GOLD LINE SOC LAND AND MOHAMAD WANVADI ROAD
South boundary
TIKHE LAND AND S NO 551 2 2B
West boundary
S NO 41 LAND AND S NO 45 GOVERMENT LAND
What’s nearby
Schools2 schools within 1km · 4 educational institutions within 1km · Library 212m away
HealthcareHospital 382m away · 7 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.7km away · 11+ restaurants and cafes within 1km · Swimming pool within 2km
ShoppingSupermarket 429m away · Mall 1.5km away · Bank 425m away
Getting around
Expressway 2.6 km · Solapur RoadPrimary road 1.2 km · Kondhwa Main RoadRailway line 2.7 km · Pune - Miraj Railway LineMetro station 3.1km away (Hadapsar)2 bus stops within 500m
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹54,490per sq yd
₹65,170per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “MOHAMMADWADI”.
In force
2026-2027 schedule
Spread
₹39,156₹73,822 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pune Municipal Corporation

Municipal Corporation
Building Permit
Survey no. 55/1/2/2A (part) + 55/1/2/2B (part)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pune Municipal Corporation

Municipal corporation

Has approved 1,863 RERA projectsabout 1 in 11 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,351
On record
9,749 flats · 439 plots
Reach
3 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,997 residential projects still under way within 25 km. Step out ring by ring:

11 projects within 1 km — showing the nearest 6.

kondhwa khurdResidential / Group Housing

SERENITY HOMES

Sammed Developers

Sep 2025registered
Dec 2027target completion
Government Guidance Rate₹55,026/sq ydScale14 flatsAuthorityMahaRERA
wanwadiMixed

Symphony of The Skies

Prathamesh Developers and Builders

Feb 2026registered
Dec 2032target completion
Government Guidance Rate₹62,501/sq ydScale171 flatsAuthorityMahaRERA
Kondhwa Khurd – EXTResidential / Group Housing

Majestique Ephelia Phase 3

Majestique Giga Homes LLP

Mar 2026registered
Dec 2030target completion
Scale38 flatsAuthorityMahaRERA
kondhwa khurdOthers

Unitas TownHomes Wing A

UNITET DEVELOPERS PRIVATE LIMITED

Nov 2024registered
Jan 2032target completion
Government Guidance Rate₹55,026/sq ydScale122 flatsAuthorityMahaRERA
kondhwa khurdResidential / Group Housing

FORESTA

Rachit Rahul Agarwal

May 2025registered
Dec 2028target completion
Government Guidance Rate₹55,026/sq ydScale18 flatsAuthorityMahaRERA
kondhwa khurdResidential / Group Housing

Ephelia Phase 2

Majestique Giga Homes LLP

Jul 2023registered
Dec 2028target completion
Government Guidance Rate₹55,026/sq ydScale78 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.