Hill Homes

T1/OL/216/2022 · K-RERA · https://gethorizon.in/projects/hill-homes-elappara-idukki-11q4ymuf

01

Complete project overview

K-RERA · Registration filing
Project name
Hill Homes
Units
30 units
Mix
15 × 2BHK · 10 × 3BHK · 5 × 1BHK
Booked
25 of 30 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
3,609 sq m
Floor area
4,464 sq m
Description
Hill Homes

Timeline

Project startedApr 2021
RERA registeredDec 2022
Proposed completionApr 2026
TodaySep 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

5 of 30 available
TypeArea sq mAvailable
2BHK911 of 5
3BHK1051 of 5
1BHK560 of 5
2BHK962 of 5
3BHK1010 of 5
2BHK981 of 5

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

New Moon Builders

PartnershipPromoter type
Idukki, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Kuttikkanam-Elappara Road
Village
ELAPPARA
Taluk
PEERUMADE
District
Idukki
Pincode
685531
Survey no.
67/7A-1-1
Patta no.
8375
What’s nearby
SchoolsNearest school 1.1km away
HealthcareHospital 843m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Mall 1.0km away · Bank 897m away
Getting around
Primary road 826 m · Hill HighwayNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 30 m · Kozhikanam Area KulamRiver 2.7 km
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹1,035per sq yd
₹1,238per sq m
Which rate
Residential Plot with NH/PWD road access
Matched to
The value published for this project's own survey number, in “Elappara”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Peerumade Gram Panchyath

Local body (LSGI)
approved 8 Oct 2021 · 4 yrs ago
Building Permit no. 82-BA(232008)2021Survey no. 67/7A-1-1

The promised possession date (1 Apr 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan 82-BA(232008)2021 on the approving authority’s portal to confirm the approval.

The approving body, at scale

The local self-government (LSGI)

The local body that approved this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

2 residential projects still under way within 25 km. Step out ring by ring:

Of the 2 projects the radar draws within 6 km — every kind, every stage — none is a residential project still under way. This list keeps only those, and looks further out.

1 project between 10 and 20 km — showing the nearest 1.

KOOTTICKALResidential (Apartment)

WINTER CASTLE

VAGAMON RESORTS AND APARTMENTS PRIVATE LIMITED

Nov 2023registered
Mar 2026target completion
Government Guidance Rate₹265/sq ydScale35 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.