HORIZON
Share

Jay vinayak city

PR/GJ/MEHSANA/KADI/Others/RAA05026/A1R/091120 · GujRERA · https://gethorizon.in/projects/jay-vinayak-city-kadi-upxayiia

01

Complete project overview

GujRERA · Registration filing
Units
233 units
Mix
233 × Residential
Carpet area
49–101 sq mper-unit range, as filed
Blocks
5
Parking
110 spaces
Land area
23,154 sq m

Timeline

Project startedNov 2018
RERA registeredMar 2019
Proposed completionJun 2024
TodaySep 2026
Construction progress

100% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

233 units across 1 batch
TypeArea sq mCount
Residential73233

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

Jay vinayak buildcon

PARTNERSHIP FIRMPromoter type
Mehsana, GujaratBased in
1Projects
1City
2019–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Kadi
District
Mehsana
Pincode
382715
Address
FF/11/12/13,Riddhi-Siddhi Square Shopping Nr.Railway crossing, kadi-Karannagar road
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 840m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Mall 1.2km away
Getting around
Primary road 882 mRailway line 630 mRailway station 910m away (Kadi)Limited bus connectivity nearby
Water & environment
Water body 1.3 km · Knjali Lake
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹36.17 Cr declared to build 233 flats. What that works out to:

₹9.51 Lakh – ₹30.00 Lakhdeclared unit pricerange on the filing — not a live asking price
₹15.53 Lakhdeclared cost per flatall-in — land + construction
₹1,969/sq ftof carpet area₹21,192/sq m
11%of the cost is land₹159/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat registration department

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

No government guidance rate is shown for this project.

Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

GujRERA · Approved building plan

Kadi Municipality

Municipal / Corporation
Building Permitapproved 12 Mar 2019 · 7 yrs ago

The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 5 blocks carry a Building-Use (BU) permission (latest 27 Apr 2021)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

Kadi Municipality

Municipal Corporation

Has approved 68 RERA projects0.4% of Gujarat.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
57
On record
5,206 flats · 0 plots
Reach
2 talukas
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

102 residential projects still under way within 25 km. Step out ring by ring:

Of the 107 projects the radar draws within 6 km — every kind, every stage — 50 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

800 m awayResidential/Group Housing

Matru Shakti

YASHVI CORPORATION · Kadi

Apr 2024registered
Jun 2028target completion
Price band₹14.60 Lakh–₹26.27 LakhScale34 flatsAuthorityGujRERA
840 m awayResidential/Group Housing

Matru Bhakti

BHARATKUMAR PUNJIRAM PATEL · Kadi

Apr 2024registered
Dec 2026target completion
Price band₹14.46 Lakh–₹23.74 LakhScale24 flatsAuthorityGujRERA
890 m awayResidential/Group Housing

MATRUBHAV

YASHVI CORPORATION · Kadi

Jun 2025registered
Dec 2028target completion
Price band₹14.30 Lakh–₹27.92 LakhScale102 flatsAuthorityGujRERA
920 m awayResidential/Group Housing

Matru Prem

BHARATKUMAR PUNJIRAM PATEL · Kadi

Oct 2024registered
Dec 2026target completion
Price band₹22.45 Lakh–₹24.34 LakhScale37 flatsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.