HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
83 units
Mix
51 × 3BHK · 32 × 2BHK
Booked
83 of 83 filed sold/bookedas declared in the RERA filing
Buildings
2
Land area
3,894 sq m
Floor area
15,806 sq m
Description
Jayaraj Srishti

Timeline

Project startedJul 2021
RERA registeredAug 2021
Proposed completionDec 2027
TodayJul 2026
Construction progress

26% overall, as filed

Sanitary Fittings0%
Electrical Fittings0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
The external plumbing and external plastering5%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings25%
Staircases, Lifts Wells25%
Overhead and Underground Water Tanks.80%
Stilt Floor95%
Stilt Floor95%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Excavation100%
Basement(s) and Plinth100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 83 available
TypeArea sq mAvailable
3BHK1270 of 8
2BHK740 of 8
2BHK740 of 8
3BHK1330 of 7
3BHK970 of 7
2BHK760 of 8
3BHK1190 of 8
3BHK1330 of 7
3BHK1250 of 7
3BHK1250 of 7
2BHK800 of 8

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Jayaraj Properties

PartnershipPromoter type
Palakkad, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
5Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
198 homeson the public record across 5 projects
33,022 sq mbuilt-up filed
9,626 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Calicut Bye Pass Road
Village
PALAKKAD-2
Taluk
Palakkad
District
Palakkad
Pincode
678001
Survey no.
1487/8, 1491/52
Patta no.
1095
What’s nearby
Schools2 schools within 1km · 3 educational institutions within 1km · Library 564m away
HealthcareHospital 1.2km away · 4 clinics within 1km · Pharmacy within 500m
Lifestyle7 parks within 500m · Gym or sports centre 1.1km away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 438m away · Convenience store within 500m · Bank 217m away
Getting around
Expressway 1.1 kmPrimary road 124 m · Palakkad - Koduvayur - Meenakshipuram RoadRailway line 361 m · Pollachi - PalakkadRailway station 4.8km away (Palakkad Junction)2 bus stops within 500m
Water & environment
Water body 76 mCanal 213 m · Malampuzha Sub Canal
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Palakkad Municipality

Municipality
approved 17 Oct 2021 · 4 yrs ago
Building Permit no. PW5BA(246491)/2018Survey no. 1487/8, 1491/52
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan PW5BA(246491)/2018 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Palakkad Municipality

Municipal corporation / municipality

Has approved 14 RERA projects0.9% of Kerala.

an apartments market93% apartments · 7% plotted layouts. Apartments like yours are this body's core business.

Builders
8
On record
668 flats · 8 plots
Since
2021

More apartment-heavy than Kerala overall — 93% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.