HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
45 units
Mix
40 × 1BHK · 4 × 1RK · 1 × HALL DINNNING
Booked
29 of 45 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
834 sq m
Floor area
2,388 sq m
Description
KRISHNA PALACE GURUVAYUR

Timeline

Project startedDec 2023
RERA registeredJan 2024
Proposed completionFeb 2028
TodayJul 2026
Construction progress

7% overall, as filed

Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Basement(s) and Plinth10%
Excavation90%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

16 of 45 available
TypeArea sq mAvailable
1BHK251 of 4
1BHK241 of 8
1BHK266 of 12
1BHK253 of 8
1BHK241 of 4
1BHK250 of 4
HALL DINNNING2461 of 1
1RK173 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

KRISHNA PROPERTY DEVELOPERS

PartnershipPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
72 homeson the public record across 2 projects
3,732 sq mbuilt-up filed
1,483 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
BABU LODGE ROAD ( MANIKATHUPADI MAMA BAZAR ROAD)
Village
THAIKKAD CHAVAKKAD
Taluk
Chavakkad
District
Thrissur
Pincode
680101
Survey no.
10/2-1 10/3-1
Patta no.
10209 10209
What’s nearby
SchoolsNearest school 1.2km away · Library 1.6km away · Kindergarten within 500m
HealthcareHospital 1.5km away
LifestyleNo parks within 2km
ShoppingSupermarket 1.5km away · Mall 1.2km away · Convenience store within 500m
Getting around
Expressway 2.2 km · Ponnani-Chavakkad-Kodungallur HighwayPrimary road 1.3 km · Guruvayoor - Althara - Ponnani RoadRailway line 1.1 km · Guruvayur-ThrissurRailway station 1.9km away (Guruvayur)2 bus stops within 500m
Water & environment
Water body 552 m
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Guruvayur Municipality

Municipality
approved 15 Mar 2023 · 3 yrs ago
Building Permit no. BA/138/22-23Survey no. 10/2-1 10/3-1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA/138/22-23 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Guruvayur Municipality

Municipal corporation / municipality

Has approved 11 RERA projects0.7% of Kerala.

an apartments market82% apartments · 18% plotted layouts. Apartments like yours are this body's core business.

Builders
8
On record
408 flats · 44 plots
Since
2021

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.