22 of 27 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
649 sq m
Floor area
1,344 sq m
Description
KRISHNA GEETHAM APARTMENT
Timeline
Project startedMar 2020
RERA registeredMar 2021
Proposed completionMar 2024
TodaySep 2026
Construction progress
87% overall, as filed
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
5 of 27 available
TypeArea sq mAvailable
1BHK211 of 3
1BHK240 of 6
1BHK271 of 4
1BHK221 of 3
1BHK310 of 4
1BHK291 of 4
1BHK241 of 3
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
Complete project overview — done
02
Builder’s track record
K-RERA · Builder registration
KRISHNA PROPERTY DEVELOPERS
PartnershipPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
LifestyleNo parks within 2km · 9 restaurants and cafes within 1km
ShoppingSupermarket 999m away · Mall 1.7km away · Convenience store within 500m
Getting around
Expressway 2.5 km · Ponnani-Chavakkad-Kodungallur HighwayPrimary road 906 m · Guruvayoor - Althara - Ponnani RoadRailway line 748 m · Guruvayur-ThrissurRailway station 1.4km away (Guruvayur)Bus stop within 1km
Water & environment
Water body 227 m · Manayil Ambala Kulam
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹2,207per sq yd
₹2,640per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Guruvayur”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
K-RERA · Approved building plan
Guruvayur Municipality
Municipality
approved 14 Feb 2020 · 6 yrs ago
Building Permit no. BA/127/19-20Survey no. 139/4-1
The promised possession date (24 Mar 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan BA/127/19-20 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Guruvayur Municipality
Municipal corporation / municipality
Has approved 11 RERA projects — 0.7% of Kerala.
an apartments market — 82% apartments · 18% plotted layouts. Apartments like yours are this body's core business.
Builders
8
On record
408 flats · 44 plots
Since
2021
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to K-RERA
Litigation
None declared in this filing
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
74 residential projects still under way within 25 km. Step out ring by ring:
Of the 35 projects the radar draws within 6 km — every kind, every stage — 8 are residential projects still under way. This list keeps only those, and looks further out.
7 projects between 1 and 3 km — showing the nearest 6.
GURUVAYURMixed (Commercial & Residential)
Krishna Homes Kizhekkeppat Heritage
BALARAMAN K N
4 yr 10 mo
Feb 2023registered
Dec 2027target completion
Government Guidance Rate₹8,830/sq ydScale52 flatsAuthorityK-RERA
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
K-RERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/krishna-geetham-apartment-guruvayur-thrissur-ufhoiphr.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.