Lotus Sopanam

T1/OL/097/2021 · K-RERA · https://gethorizon.in/projects/lotus-sopanam-nadama-ernakulam-wv0i6fuf

01

Complete project overview

K-RERA · Registration filing
Project name
Lotus Sopanam
Units
41 units
Mix
39 × 3BHK · 2 × 4BHK
Booked
41 of 41 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,805 sq m
Floor area
9,485 sq m
Description
Lotus Sopanam

Timeline

Project startedNov 2019
RERA registeredApr 2021
Proposed completionMay 2024
TodaySep 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

0 of 41 available
TypeArea sq mAvailable
4BHK3530 of 2
3BHK4,4310 of 39

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

VEDAPURI LOTUS PROPERTIES PVT LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
6Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
124 homeson the public record across 6 projects
22,397 sq mbuilt-up filed
6,412 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Tripunithura MunicipalityMunicipalitythis project5 of 6 projects
Kochi Municipal CorporationMunicipal Corporation1 of 6 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from VEDAPURI LOTUS PROPERTIES PVT LTD— the full portfolio →

03

Location

K-RERA · Registration filing
Street
STATUE JN.
Village
NADAMA
Taluk
Kanayannur
District
Ernakulam
Pincode
682301
Survey no.
OLD SURVEYNO. 1064/2, RE-SURVEY NO.9, RE-SURVEY BLOCK 271,
Patta no.
13852
What’s nearby
Schools3 schools within 1km · 7 educational institutions within 1km · College or university 638m away
HealthcareHospital 449m away · 5 clinics within 1km · Pharmacy within 1km
LifestylePark 1.3km away · Gym or sports centre 788m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 634m away · Mall 914m away · Convenience store within 500m
Getting around
Expressway 1.3 km · Kochi - Dhanushkodi RoadPrimary road 553 m · Ettumanoor - Ernakulam RoadRailway line 1.3 kmRailway station 1.5km away (Tripunittura)2 bus stops within 500m
Water & environment
Canal 423 mWater body 434 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹22,074per sq yd
₹26,400per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Nadama”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Tripunithura Municipality

Municipality
approved 14 Sep 2022 · 4 yrs ago
Building Permit no. PW2/BA-45/19-20(9786/22)Survey no. OLD SURVEYNO. 1064/2, RE-SURVEY NO.9, RE-SURVEY BLOCK 271,

The promised possession date (30 May 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan PW2/BA-45/19-20(9786/22) on the approving authority’s portal to confirm the approval.

The approving body, at scale

Tripunithura Municipality

Municipal corporation / municipality

Has approved 28 RERA projects1.8% of Kerala.

an apartments market89% apartments · 11% plotted layouts. Apartments like yours are this body's core business.

Builders
20
On record
1,173 flats · 46 plots
Since
2021

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

186 residential projects still under way within 25 km. Step out ring by ring:

11 projects within 1 km — showing the nearest 6.

NADAMAResidential (Apartment)

BHANU BHAVAN BY VARMA

VARMA HOMES PRIVATE LIMITED

Nov 2024registered
Dec 2029target completion
Government Guidance Rate₹11,037/sq ydScale45 flatsAuthorityK-RERA
NADAMAResidential (Apartment)

LOTUS SAMSKRITHI

VEDAPURI LOTUS PROPERTIES PVT LTD

May 2025registered
Dec 2027target completion
Government Guidance Rate₹8,278/sq ydScale12 flatsAuthorityK-RERA
NADAMAResidential (Apartment)

SIDDHI CHANDRAVILASAM

SIDDHI HOMES

May 2023registered
Mar 2028target completion
Government Guidance Rate₹3,863/sq ydScale23 flatsAuthorityK-RERA
THEKKUMBHAGOM KANAYANNURResidential (Apartment)

SIDDHI PRANAVAM

SIDDHI HOMES

Dec 2021registered
Aug 2026target completion
Scale49 flatsAuthorityK-RERA
THEKKUMBHAGOM KANAYANNURResidential (Apartment)

VARMA KOVILAKAM

VARMA HOMES PRIVATE LIMITED

Jan 2026registered
Apr 2031target completion
Scale57 flatsAuthorityK-RERA
THEKKUMBHAGOM KANAYANNURResidential (Apartment)

GREEN TREE

AR Builders & Contractors

Aug 2024registered
Aug 2027target completion
Scale12 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.