HORIZON
Share

MANBHA RESIDENCY

P52000080017 · MahaRERA · https://gethorizon.in/projects/manbha-residency-dapoli-panvel-crrj3uqp

01

Complete project overview

MahaRERA · Registration filing
Units
78 units
Floors
8
Buildings
2
Parking
27 spaces
Land area
880 sq m
Sanctioned built-up
3,548 sq m

Timeline

RERA registeredApr 2025
Proposed completionDec 2028
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Plinth80%
Excavation100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

DATTATRAY YASHWANT BHAKARE

IndividualPromoter type
Thane, MAHARASHTRABased in
2Projects
1City
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
124 homeson the public record across 2 projects
4,897 sq mbuilt-up filed
1,779 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from DATTATRAY YASHWANT BHAKARE— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Dapoli
Taluka
Panvel
District
Raigarh
Pincode
410221
Survey no.
PLOT NO-412, SECTOR-3, PUSHPAK, NAVI MUMBAI
North boundary
PLOT NO 465
East boundary
PLOT NO 413
South boundary
PROP 15 MTS WIDE ROAD
West boundary
PLOT NO 411
What’s nearby
SchoolsNearest school 1.9km away
HealthcareHospital 637m away · Clinic within 2km · Pharmacy within 1km
Lifestyle1 park within 500m · 9 restaurants and cafes within 1km
ShoppingSupermarket 904m away · Bank 707m away
Getting around
Primary road 504 m · Ghansoli FlyoverRailway line 457 m · Trans-Harbour LineNo metro or railway within 5km13 bus stops within 500m
Water & environment
Water body 300 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹46,238per sq yd
₹55,300per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Dapoli”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

City and Industrial Development Corporation (CIDCO)

Development Authority
Building Permit
Survey no. PLOT NO-412, SECTOR-3, PUSHPAK, NAVI MUMBAI
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

City and Industrial Development Corporation (CIDCO)

Metropolitan / development authority

Has approved 885 RERA projectsabout 1 in 23 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

5,483 residential projects still under way within 25 km. Step out ring by ring:

Of the 318 projects the radar draws within 6 km — every kind, every stage — 134 are residential projects still under way. This list keeps only those, and looks further out.

19 projects within 1 km — showing the nearest 6.

Navi MumbaiMixed

CENTURY THREE

M/s. SHUBHAM DEVELOPERS

Jan 2026registered
Dec 2028target completion
Scale79 flatsAuthorityMahaRERA
Navi MumbaiOthers

Krishna Iris

Gami and Krishna Enterprises LLP

Feb 2025registered
Dec 2028target completion
Scale90 flatsAuthorityMahaRERA
Navi MumbaiOthers

Gami Telon

LAL GEBI INFRA PRIVATE LIMITED

Apr 2025registered
Dec 2029target completion
Scale72 flatsAuthorityMahaRERA
GhansoliResidential / Group Housing

SADGURU SHREE SWAMI SAMARTH RESIDENCY

SHREESADGURU INFRABUILD LLP

Oct 2025registered
May 2029target completion
Government Guidance Rate₹79,432/sq ydScale39 flatsAuthorityMahaRERA
Navi MumbaiOthers

GAMI ASTERS B WING

THALIA AND GAMI ENTERPRISES

May 2022registered
Dec 2026target completion
Scale137 flatsAuthorityMahaRERA
Navi MumbaiOthers

AKSHAR PANCHRATNA

AKSHAR DREAM HOMES

Jun 2023registered
Jun 2027target completion
Scale77 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.