HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

MANTRA CITY 360 PHASE 06

P52100016953 · MahaRERA · https://gethorizon.in/projects/mantra-city-360-phase-06-talegaon-dabhade-m-cl-mawal-k0oey7rx

Registration de-registered

MahaRERA has de-registered this project — the registration was cancelled. This is a serious signal: the project is no longer under active RERA registration. Do not transact without independent legal verification of what happened and where the project stands.

01

Complete project overview

MahaRERA · Registration filing
Units
261 units
Mix
153 × 1 BHK · 44 × 2 BHK · 42 × 1 RK · 22 × 1.5 BHK
Carpet area
20–52 sq mper-unit range, as filed
Floors
14
Buildings
2
Parking
107 spaces
Land area
4,250 sq m
Recreational open space
2,725 sq m

Timeline

RERA registeredJun 2018
Proposed completionDec 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

261 units across 6 batches
TypeArea sq mCount
1 BHK3865
2 BHK5222
1.5 BHK4622
1 RK2042
2 BHK4022
1 BHK2988

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

MANTRA ISLAND HOMES TALEGAON LLP

PartnershipPromoter type
Pune, MAHARASHTRABased in
5Projects
1City
2017–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,123 homeson the public record across 5 projects
28,256 sq mbuilt-up filed
29,258 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MANTRA ISLAND HOMES TALEGAON LLP— the full portfolio →

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 18.7175, 73.6816 · © OpenStreetMap contributors
Village
Talegaon Dabhade (M Cl)
Taluka
Mawal
District
Pune
Pincode
410506
Survey no.
S NO 389 1 A TALEGAON DABHADE TAL MAVEL
North boundary
BUILDING A1
East boundary
BUILDING C1
South boundary
PROJECT SIDE MARGINE
West boundary
REMAINING PORTION OF GAT NO 389
What’s nearby
Schools2 schools within 1km · College or university 2.0km away
HealthcareHospital 1.2km away · 1 clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 1.2km away · Swimming pool within 2km
ShoppingSupermarket 909m away · Mall 662m away · ATM within 500m
Getting around
Expressway 630 mPrimary road 3.5 km · Urse Talegaon RoadRailway line 1.4 kmRailway station 1.6km away (Ghorawadi)2 bus stops within 500m
Water & environment
Water body 724 m · Talegaon sanskruti Lake
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

1,601 residential projects still under way within 25 km. Step out ring by ring:

10 projects within 1 km — showing the nearest 6.

Talegaon DabhadeOthers

SWAPNPURTI

A SQUARE BUILDCON

Mar 2025registered
Mar 2027target completion
Scale46 flatsAuthorityMahaRERA
Talegaon DabhadeResidential / Group Housing

GOKULDHAM 4TH AVENUES

KULDEEP VIDYANAND JADHAV

Aug 2026registered
Dec 2027target completion
Scale41 flatsAuthorityMahaRERA
Talegaon DabhadeOthers

WHITESTONE CELESTIA

WHITESTONE REALTORS

Mar 2025registered
Dec 2027target completion
Scale27 flatsAuthorityMahaRERA
Talegaon DabhadeResidential / Group Housing

Prammukh Aisshwaryam

Amit Ramniklal Waghela

May 2026registered
Jun 2028target completion
Scale14 flatsAuthorityMahaRERA
Talegaon DabhadeOthers

SAI PARKTOWN

ADITYA CONSTRUCTIONS

Feb 2025registered
Dec 2027target completion
Scale30 flatsAuthorityMahaRERA
Talegaon DabhadeResidential / Group Housing

Luxuria

Prammukh Associates

Dec 2024registered
Aug 2026target completion
Scale41 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mantra-city-360-phase-06-talegaon-dabhade-m-cl-mawal-k0oey7rx.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.