Yes — registered under affordable housingprice caps & eligibility apply
Timeline
Project startedOct 2017
RERA registeredMar 2018
Proposed completionDec 2019
TodaySep 2026
Construction progress
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
23 units across 2 batches
TypeArea sq mCount
Shop75
Residential4318
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
GujRERA · Registration filing
Taluka
Rajkot
District
Rajkot
Pincode
360006
Address
PARASHAR PARK,JAMNAGAR ROADMADHAPAR
What’s nearby
SchoolsNo schools within 2km · College or university 1.5km away
HealthcareHospital 474m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 292 m · 150 feet ring roadPrimary road 211 m · Jamnagar -Rajkot highway FlyoverRailway line 1.0 kmRailway station 3.5km away (Rajkot Junction)Limited bus connectivity nearby
Water & environment
River 3.3 km · Aji River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹1.74 Cr declared to build 23 flats. What that works out to:
₹6.00 Lakh – ₹12.00 Lakhdeclared unit pricerange on the filing — not a live asking price
₹7.55 Lakhdeclared cost per flatall-in — land + construction
16%of the cost is land₹731/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹5,393per sq yd
₹6,450per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “MADHAPAR”.
In force
2011 schedule
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Rajkot Urban Development Authority
Urban Development Authority
Building Permitapproved 7 Mar 2018 · 8 yrs ago
The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Rajkot Urban Development Authority
Urban Development Authority
Has approved 295 RERA projects — 1.7% of Gujarat.
an apartments market — 96% apartments · 4% plotted layouts. Apartments like yours are this body's core business.
Builders
262
On record
20,916 flats · 369 plots
Reach
6 talukas
Since
2012
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Number
Date
SM-55/2018
1 Jun 2018
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
411 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,031 projects the radar draws within 6 km — every kind, every stage — 202 are residential projects still under way. This list keeps only those, and looks further out.