HORIZON
Share

PINK TOPAZ

P52100049390 · MahaRERA · https://gethorizon.in/projects/pink-topaz-sangavi-mawal-we4ptrnc

01

Complete project overview

MahaRERA · Registration filing
Project name
PINK TOPAZ
Units
600 units
Mix
600 × 1 BHK
Carpet area
23 sq mper-unit range, as filed
Floors
5
Buildings
6
Parking
1,128 spaces
Land area
14,812 sq m
Sanctioned built-up
14,581 sq m
Recreational open space
1,347 sq m

Timeline

RERA registeredFeb 2023
Proposed completionDec 2027
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Electrical meter r…0%
Aggregate area of …0%
Open Parking0%
LIFT0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

600 units across 1 batch
TypeArea sq mCount
1 BHK23600

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

PINK TOPAZ AOP

CompanyPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Sangavi
Taluka
Mawal
District
Pune
Pincode
412106
Survey no.
SURVEY NO. 81/2 AT SANGVI
North boundary
SANGVI JAMBHUL 40 MTR ROAD
East boundary
GAT NO 81
South boundary
PROPERTY OF MR NARAYAN ZAREKAR OF GAT NO 72
West boundary
PROPERTY OF NAVGHANE AND BOUNDARY OF VILLAGE SHIV
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.4km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 2.3 km · Mumbai - Pune Expressway (Toll Road)Railway line 2.0 km · Mumbai–Pune RailwayRailway station 2.2km away (Vadgaon)Limited bus connectivity nearby
Water & environment
River 964 m · IndrayaniWater body 2.3 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

1,078 residential projects still under way within 25 km. Step out ring by ring:

Of the 315 projects the radar draws within 6 km — every kind, every stage — 62 are residential projects still under way. This list keeps only those, and looks further out.

14 projects between 1 and 3 km — showing the nearest 6.

1.9 km awayResidential / Group Housing

Shri Vinayak Heights

Shri Vinayak Construction · Wadagaon · Mawal

Apr 2026registered
Mar 2027target completion
Government Guidance Rate₹33,646/sq ydScale16 flatsAuthorityMahaRERA
2.0 km awayOthers

SAMARTH HEIGHTS

SWAMISAMARTH DEVELOPERS · Wadagaon · Mawal

Mar 2022registered
Dec 2026target completion
Government Guidance Rate₹33,646/sq ydScale48 flatsAuthorityMahaRERA
2.4 km awayResidential / Group Housing

Urban Nest

GM Ventures · Katavi · Mawal

Sep 2026registered
Dec 2030target completion
Scale50 flatsAuthorityMahaRERA
2.5 km awayMixed

RIDDHI HEIGHTS

V4 ENTERPRISES · Katavi · Mawal

Jan 2026registered
Jun 2029target completion
Scale56 flatsAuthorityMahaRERA
2.8 km awayOthers

AVIGHNA HEIGHTS

AVIGHNA DEVELOPERS · Wadagaon · Mawal

Nov 2023registered
Mar 2026target completion
Government Guidance Rate₹33,646/sq ydScale65 flatsAuthorityMahaRERA
2.8 km awayResidential / Group Housing

SUNBLISS VILLA

ADVIKA ENTERPRISES · Wadagaon · Mawal

Nov 2025registered
Dec 2027target completion
Government Guidance Rate₹33,646/sq ydScale21 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.