The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
K-RERA · Registration filing
Street
KALLIKKADU
Village
KOLIYACODE
Taluk
Nedumangad
District
Thiruvananthapuram
Pincode
695607
Survey no.
228/26-1, 228/7,228/8,228/9,228/10
Patta no.
11373,11513,11796,2024
What’s nearby
SchoolsNo schools within 2km · Library 402m away
HealthcareHospital 481m away
LifestyleNo parks within 2km
ShoppingSupermarket 340m away
Getting around
Primary road 264 m · Kazhakoottam-Kilimanoor RoadNo metro or railway within 5kmBus stop within 500m
Water & environment
Water body 1.1 km · Theeppuckal muttukonathu chiraCanal 1.9 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹441per sq yd
₹528per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Koliyakkode”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
The promised possession date (20 May 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan A6/4208/2024 on the approving authority’s portal to confirm the approval.
The approving body, at scale
The local self-government (LSGI)
The local body that approved this project. It has approved 404 RERA projects across 14 districts — about 1 in 4 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
K-RERA · public record
Complaints register
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to K-RERA
Litigation
None declared in this filing
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
52 plotted projects still under way within 25 km. Step out ring by ring:
2 projects between 1 and 3 km — showing the nearest 2.
KOLIYACODEVillas (Plots & Buildings)
URBANSCAPE DIVINITY VILLAS
Urbanscape Properties LLP
5 yr
Dec 2023registered
Dec 2028target completion
Government Guidance Rate₹441/sq ydScale30 plotsAuthorityK-RERA