This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools4 schools within 1km · 4 educational institutions within 1km · College or university 1.3km away
HealthcareHospital 947m away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 1.4km away · 6 restaurants and cafes within 1km
ShoppingSupermarket 902m away · Bank 893m away
Getting around
Primary road 807 m · Sant Dyaneshwar MargNo metro or railway within 5kmBus stop within 1km
Water & environment
River 394 m · IndrayaniWater body 1.4 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹49,616per sq yd
₹59,340per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Charoli”.
In force
2026-2027 schedule
Spread
₹35,719 – ₹49,616 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pimpri Chinchwad Municipal Corporation
Municipal Corporation
Building Permit
Survey no. S.No.494/4P of Mouje Charholi
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pimpri Chinchwad Municipal Corporation
Municipal corporation
Has approved 1,391 RERA projects — about 1 in 14 in Maharashtra.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12603650
12 Jun 2026
Bench Assignedopen
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,170 residential projects still under way within 25 km. Step out ring by ring:
Of the 786 projects the radar draws within 6 km — every kind, every stage — 244 are residential projects still under way. This list keeps only those, and looks further out.
15 projects within 1 km — showing the nearest 6.
150 m awayOthers
AUSTIN TOWER
KALPDEEP PROMOTORS AND BUILDERS · CHARHOLI · Haveli
3 yr 10 mo
Feb 2024registered
Dec 2027target completion
Government Guidance Rate₹49,616/sq ydScale108 flatsAuthorityMahaRERA