01

Complete project overview

RERA Bihar · Registration filing
Project name
R R COMPLEX
Parking
19 spaces
Land area
655 sq m
Built-up area
2,294 sq m

Timeline

Project startedSep 2018
RERA registeredOct 2019
Proposed completionMar 2020
TodaySep 2026
02

Builder’s track record

RERA Bihar · Builder registration

UNIBERA GROUP LIMITED

CompanyPromoter type
South Delhi, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2019–2020Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Muzaffarpur
City / town
MUZAFFARPUR
Anchal (block)
Musahari
Mauja (revenue village)
Musahari
Address
JAMADAR SINGH CHOWK RAMDAYALU ROAD MUZAFFARPUR BIHAR
What’s nearby
SchoolsNo schools within 2km
HealthcareNo hospital within 5km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 2.5 kmPrimary road 4.3 kmRailway line 2.3 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 312 mCanal 2.5 kmWater body 5.0 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹1.90 Cr declared. What that works out to:

21%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹3,099per sq yd
₹3,707per sq m
Which rate
residential
Matched to
The rate published for the village of “Mushahari (Radha Nagar)”.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (31 Mar 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

30 residential projects still under way within 25 km. Step out ring by ring:

Of the 16 projects the radar draws within 6 km — every kind, every stage — 6 are residential projects still under way. This list keeps only those, and looks further out.

6 projects between 3 and 6 km — showing the nearest 6.

4.1 km awayResidential/Group Housing

SAHAYA BHAWAN

SHASHI RAJAN CONSTRUCTION PVT LTD · Musahari · Muzaffarpur

Apr 2025registered
Mar 2030target completion
Declared cost₹19.00 CrScale64 flatsAuthorityRERA Bihar
4.3 km awayResidential/Group Housing

GREEN GHAR EXT-01 PHASE-III

GREEN GHAR INFRASTUCTURE AND CONSTRUCTION PVT LTD · dighra rampur sah · muzaffarpur

Feb 2023registered
Apr 2027target completion
Declared cost₹32.50 CrScale13 flatsAuthorityRERA Bihar
4.3 km awayResidential

GREEN GHAR EXT-01, PHASE -II

GREEN GHAR INFRASTUCTURE AND CONSTRUCTION PVT LTD · Muzaffarpur

Jul 2024registered
Dec 2027target completion
Declared cost₹1.71 CrAuthorityRERA Bihar
5.6 km awayResidential/Group Housing

SNEH- KUSUM RESIDENCY

TECHNO HIGHTS PRIVATE LIMITED · PARMANANDPUR · MUZAFFARPUR

May 2026registered
Jul 2030target completion
Declared cost₹2.85 CrScale8 flatsAuthorityRERA Bihar
5.8 km awayResidential

Brajmohan Apartment

PRAJAPATI SMART HOMES PRIVATE LIMITED · Bhagalpur

Nov 2023registered
Mar 2028target completion
no escrow declaredDeclared cost₹8.91 CrAuthorityRERA Bihar
6.0 km awayMixed Development(residential and commercial)

OM PARADISE

MAA BHAWANI INFRA AND DEVELOPERS · Musahari · MUZAFFARPUR

Jul 2025registered
Aug 2030target completion
Declared cost₹16.00 CrScale73 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.