Complete project overview

K-RERA · Registration filing
Units
48 units
Mix
48 × 3BHK
Booked
48 of 48 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,365 sq m
Floor area
7,942 sq m
Description
RDS LEGACY

Timeline

Project startedJul 2016
Proposed completionDec 2019
RERA registeredMar 2021
TodayJul 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 48 available
TypeArea sq mAvailable
3BHK4,8740 of 48

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

RDS REALTIES LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
3Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
107 homeson the public record across 3 projects
20,510 sq mbuilt-up filed
5,736 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
VIDHYANAGAR CROSS ROAD
Village
ELAMKULAM
Taluk
Kanayannur
District
Ernakulam
Pincode
682020
Survey no.
743/11
Patta no.
24032
What’s nearby
SchoolsNearest school 1.2km away · 4 educational institutions within 1km · College or university 1.7km away
HealthcareHospital 99m away · 23 clinics within 1km · Pharmacy within 500m
LifestylePark 882m away · Gym or sports centre 229m away · 110+ restaurants and cafes within 1km
ShoppingSupermarket 383m away · Convenience store within 500m · Bank 139m away
Getting around
Expressway 2.1 kmPrimary road 214 m · Sahodaran Ayyappan RoadRailway line 757 mMetro station 253m away (Kadavanthra)7 bus stops within 500mAirport 3.8km away
Water & environment
Canal 148 m · Thevara-Perandoor CanalWater body 321 m · Temple Pond
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Cochin Municipal Corporation

Municipal Corporation
approved 16 Oct 2015 · 10 yrs ago
Building Permit no. KRP1/351/14/COC/KRP/884/14Survey no. 743/11

The promised possession date (5 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan KRP1/351/14/COC/KRP/884/14 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Cochin Municipal Corporation

Municipal corporation / municipality

Has approved 40 RERA projects2.6% of Kerala.

an apartments market98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.

Builders
24
On record
1,429 flats · 19 plots
Since
2021

More apartment-heavy than Kerala overall — 98% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.