HORIZON
Share

REVANTA CITY

P-BPL-18-1752 · RERA Madhya Pradesh · https://gethorizon.in/projects/revanta-city-bhopal-huzur-2l84qlgu

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
REVANTA CITY
Units
144 flats
Unit mix
96 × 3BHK · 48 × 2BHK
Quarterly reports
20 on file · latest Oct 2018 - Dec 2018quarterly progress certificates filed with RERA

Timeline

Project startedApr 2012
RERA registeredApr 2018
Proposed completionJun 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

144 units across 2 batches
TypeArea sq mCount
2BHK48
3BHK96

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

BHARTI BUIDERS

Partnership Firm / LLPPromoter type
1Projects
1City
2018–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Bhopal
Tehsil
Huzur
Planning area
Bhopal
Address
REVANTA CITY,LAMBHAKHEDA,NEAR MATA MANDIR BERASIA ROAD BHOPAL
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 425m away
LifestyleNo parks within 2km
ShoppingSupermarket 1.7km away
Getting around
Expressway 1.3 km · Bhopal BypassPrimary road 145 mRailway line 4.2 km · BPL - MKC Rail SectionRailway station 4.9km away (Nishatpura)Limited bus connectivity nearby
Water & environment
Water body 1.4 kmRiver 3.2 km · Halali
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹12.34 Cr declared to build 144 flats. What that works out to:

₹8.57 Lakhdeclared cost per flatall-in — land + construction
14%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹20,903per sq yd
₹25,000per sq m
Which rate
multi-storey residential
Matched to
The middle rate of the 28 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

LAMBAKHEDA / NABIBAGH EVM ANY COLONY₹22,000 / sq m₹18,395 / sq yd490 m
AADARSH GRAH NIRMAN / CORAL LIFE₹25,000 / sq m₹20,903 / sq yd570 m
MOHAMMAD NAGAR , SATTI KHEDI₹11,000 / sq m₹9,197 / sq yd1.4 km
DEVALKHEDI EVM ANY COLONY₹8,000 / sq m₹6,689 / sq yd1.6 km
ARWALIYA EVM ANY COLONY₹7,000 / sq m₹5,853 / sq yd1.9 km

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Bhopal

Town & Country Planning (DTCP)
Building Permitapproved 16 Apr 2018 · 8 yrs ago

The promised possession date (30 Jun 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Bhopal

Town & Country Planning area · Bhopal district

Has approved 726 RERA projectsabout 1 in 7 in Madhya Pradesh.

a mixed market63% apartments · 37% plotted layouts.

Builders
444
On record
45,421 flats · 32,913.65 plots
Reach
2 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 63% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

71 residential projects still under way within 25 km. Step out ring by ring:

Of the 67 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.

1 project within 3 km — showing the nearest 1.

BhopalIndividual houses

BALAJI PARISAR PHASE-II

LUCKY REAL ESTATE DEVELOPERS

Jan 2023registered
Sep 2026target completion
possession revisedDeclared cost₹5,000Scale97 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.