LOTUS EMPIRE
SHIVAM BUILDERS · Rajkot
ROYAL PLUS
Timeline
85% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹2.28 Cr declared to build 11 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 May 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
All 1 block carry a Building-Use (BU) permission (latest 14 Jun 2022)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The body that approved this project. It has approved 2,653 RERA projects across 26 talukas — about 1 in 6 in Gujarat.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with GujRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
112 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,518 projects the radar draws within 6 km — every kind, every stage — 89 are commercial projects still under way. This list keeps only those, and looks further out.
5 projects within 1 km — showing the nearest 5.
SHIVAM BUILDERS · Rajkot
URBAN SQUARE ENTERPRISE · Rajkot
SAPTAK DEVLOPERS · Rajkot
GANESH BUILDCON · Rajkot
PRIDE CONSTRUCTION · Rajkot
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you